Pulling the Plug, Preserving the Product: Protecting Rights to a Modular Subcontractor’s Work Post-Termination
June 08, 2026 —
Paul Williamson - ConsensusDocsVolumetric Modular Construction (VMC) is a building method where a structure is divided into large components or modules, fabricated in an offsite factory and then transported to a construction site for assembly.[
1] Proponents of VMC hail it as a cost-efficient alternative to traditional building methods that leads to more consistent quality and shorter construction duration.[
2] Due to a growing labor shortage, high demand for compressed project schedules, and stagnant construction productivity rates, the construction industry is embracing VMC.[
3] A recent report on the market size of prefabricated construction estimates that from 2026 to 2031, VMC will grow at a compound annual growth rate of 7.16% and become a 413.11-billion-dollar industry.[
4]
As VMC becomes more prevalent, owners, general contractors, and subcontractors must consider how to effectively contract for modular construction. One important consideration, which this article focuses on, is navigating termination of a modular subcontractor.
Read the full story...Reprinted courtesy of
Paul Williamson, Peckar & Abramson, P.C.Mr. Williamson may be contacted at
pwilliamson@pecklaw.com
Snell & Wilmer’s Orange County Office Recognized as One of the “Best Places to Work” by the Orange County Business Journal
August 16, 2026 —
Snell & WilmerORANGE COUNTY – Snell & Wilmer is pleased to announce that its Orange County office has been selected as one of the 2026 “Best Places to Work in Orange County” by the Orange County Business Journal. This recognition honors outstanding employers that foster exceptional workplace cultures and demonstrate a strong commitment to employee engagement, professional development, and organizational excellence.
The annual awards recognize Orange County employers that create positive workplace environments and set the standard for employee satisfaction and organizational success. Honorees are selected through a comprehensive evaluation process that includes confidential employee surveys and an independent assessment of company policies, practices, philosophy, systems, and demographics.
Read the full story...Reprinted courtesy of
Snell & Wilmer
HHMR Honored as a 2026 Denver Business Journal Best Places to Work Recipient
March 10, 2026 —
David McLain - Colorado Construction Litigation BlogWe are pleased to share that Higgins, Hopkins, McLain & Roswell has been named a 2026 Denver Business Journal Best Places to Work honoree, a recognition grounded entirely in direct feedback from our own team members.
The Denver Business Journal Best Places to Work program, in partnership with Quantum Workplace, ranks organizations based on anonymous employee engagement survey results that measure culture, leadership, communication, trust, team dynamics, and satisfaction. This year’s list includes 65 companies across the Denver metropolitan area, judged by the people who know these workplaces best: their employees.
Read the full story...Reprinted courtesy of
David McLain, Higgins, Hopkins, McLain & RoswellMr. McLain may be contacted at
mclain@hhmrlaw.com
Cuomo Bridge Lawsuit Adversaries Weigh Mediated Settlement
July 06, 2026 —
Richard Korman - Engineering News-RecordRival legal teams have reached a critical juncture as they consider a mediated settlement in one of two major payment lawsuits pending between a design-build contracting team and the New York State Thruway Authority over construction of the more than $3-billion Mario M. Cuomo Bridge north of New York City.
Read the full story...Reprinted courtesy of
Richard Korman, Engineering News-RecordMr. Korman may be contacted at
kormanr@enr.com
Alert: Fraudulent Notice of Nonpayment Defense Applies to Payment Bond Claims
April 27, 2026 —
David Adelstein - Florida Construction Legal UpdatesUnder Florida’s Lien Law, there’s an affirmative defense or affirmative claim known as a “
fraudulent lien.” The fraudulent lien defense or claim is set out in Florida Statute s. 713.31. This defense also extends to payment bond claims, whether under a private statutory payment bond (Florida Statute s. 713.23) or a public payment bond (Florida Statute s. 255.05), as it pertains to the notice of nonpayment. A notice of nonpayment needs to be served within 90 days from final furnishing to preserve a claimant’s rights against the bond. However, there really has not been a case, until now, that discusses a “fraudulent notice of nonpayment.”
In K&M Electric Supply, Inc. v. Brown Electrical Solutions, LLC, 51 Fla.L.Weekly D672a (Fla. 4th DCA 2026), a prime contractor and surety prevailed at the trial level on their fraudulent notice of nonpayment defense based on a supplier’s notice of nonpayment and action against a public payment bond (under Florida Statute s. 255.05).
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
“He Chose…Poorly: How Bad DSC Clauses Lead to Project Doom in the Last Crusade of Construction Risk”
March 10, 2026 —
Curt Martin & Lee Banta - ConsensusDocs“We do not follow maps to buried treasure, and X never, ever marks the spot.” That’s the advice that Indiana Jones offered in the Last Crusade film. But what’s beneath the surface isn’t just important to adventure archaeologists. It has real-world application to our industry, where success depends on the stability of materials below the surface.
The study of geology and soils has ancient roots. Egyptians relied on soil stability for the pyramids; Rome built a continent-wide roadway system utilizing subgrade preparation techniques; Medieval builders implemented a rudimentary foundation pier system; Henri Gautier studied what is now called the “angle of repose” for French retaining walls in the early 18th Century.
Through the 19th Century, contractors bore the risk of the stability of their work, and the attendant peril of unforeseen site conditions. But in the early 20th Century, design trades continued to develop increased understanding of soil and underground conditions. In the 1920’s US federal contracts began employing “differing site conditions” clauses, which provided for cost/time adjustments if subsurface conditions differed from expectations. Industry forms followed the federal policy, and these clauses became almost universally accepted.
Reprinted courtesy of
Curt Martin, Peckar & Abramson, P.C. and
Lee Banta, Peckar & Abramson, P.C.
Mr. Martin may be contacted at cmartin@pecklaw.com
Mr. Banta may be contacted at lbanta@pecklaw.com
Read the full story...
Moving in Before Substantial Completion? The Risks of Early Owner Occupancy
March 24, 2026 —
Sydney Koby - ConsensusDocsIntroduction
On many construction projects, particularly large projects facing schedule pressure, owners may begin occupying or using portions of the project before the work reaches substantial completion. This is often due to operational needs, phased turnover, or market demands that drive owners to take possession of all or part of a project while construction activities are ongoing. While early occupancy may seem practical, it can blur the lines of responsibility between owner and contractor and can create significant legal and practical complications.
These disputes are especially common on large, complex projects where punch list work, system commissioning, and closeout activities overlap with owner use. Without clear documentation and carefully drafted contract provisions, early occupancy can undermine an owner’s ability to enforce completion requirements while simultaneously exposing the contractor to claims of delay, inefficiency, or interference.
Read the full story...Reprinted courtesy of
Sydney Koby, Jones WalkerMs. Koby may be contacted at
skoby@joneswalker.com
Sometimes a General Damages Assessment is Enough. . .
July 06, 2026 —
Christopher G. Hill - Construction Law MusingsIt has been a while since I last posted here at
Construction Law Musings. Life, law practice, and “blogger’s block” have taken their toll on the posting schedule. Hopefully this will be one of several upcoming posts now that the litigation schedule has lightened a bit over the summer.
Today’s post is about damages. Specifically damage to a homeowner’s roof and her legal damages therefor. That last is of course a sentence that only a
construction attorney (or other litigator) could possibly craft and have it make sense. Now, on with the case. . .In
Hardesty Construction, Inc. v. Weedon, the facts are as follows:
Ms. Weedon had hail damage to the roof of her home. She hired Hardesty Construction to repair and replace the roof. After the first roof was installed and failed inspection, a second roof was installed. The issue was that the first roof had a warranty and the second roof, installed similarly to the first (and allegedly with the same construction issues according to Ms. Weedon’s expert), was not provided with the promised warranty. As one may expect, Weedon sued Hardesty and Hardesty Construction for fraudulent inducement and breach of contract. At trial, Weedon testified, without objection, that her home was worth $40,000 less because of Hardesty Construction’s work, which was based partially on quotes Weedon received to fix the roof. The Circuit Court granted Hardesty Construction’s motion to strike Weedon’s fraudulent inducement claim, but not her other claims. A jury awarded Weedon $30,253.30 on her breach of contract claim. Hardesty Construction appealed, arguing the Circuit Court erred in (a) allowing the jury to consider Weedon’s valuation testimony because it was not based on her personal knowledge and (b) denying its motion to strike based on insufficient evidence as to damages. Weedon assigned cross-error in the Circuit Court’s decision to grant the motion to strike her fraudulent inducement claim against Samual Hardesty.
Read the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com