BERT HOWE
  • Nationwide: (800) 482-1822    
    structural steel construction expert witness Martha Oklahoma custom homes expert witness Martha Oklahoma casino resort expert witness Martha Oklahoma low-income housing expert witness Martha Oklahoma townhome construction expert witness Martha Oklahoma high-rise construction expert witness Martha Oklahoma retail construction expert witness Martha Oklahoma Medical building expert witness Martha Oklahoma condominiums expert witness Martha Oklahoma multi family housing expert witness Martha Oklahoma office building expert witness Martha Oklahoma Subterranean parking expert witness Martha Oklahoma condominium expert witness Martha Oklahoma mid-rise construction expert witness Martha Oklahoma landscaping construction expert witness Martha Oklahoma institutional building expert witness Martha Oklahoma industrial building expert witness Martha Oklahoma housing expert witness Martha Oklahoma parking structure expert witness Martha Oklahoma tract home expert witness Martha Oklahoma hospital construction expert witness Martha Oklahoma custom home expert witness Martha Oklahoma
    Martha Oklahoma contractor expert witnessMartha Oklahoma construction expert testimonyMartha Oklahoma fenestration expert witnessMartha Oklahoma multi family design expert witnessMartha Oklahoma expert witness structural engineerMartha Oklahoma expert witness concrete failureMartha Oklahoma construction expert witness consultant
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Martha, Oklahoma

    Oklahoma Builders Right To Repair Current Law Summary:

    Current Law Summary: Case law precedent


    Construction Expert Witness Contractors Licensing
    Guidelines Martha Oklahoma

    Resident electrical, mechanical, and plumbing contractors must be licensed. There are special requirements for non-resident contractors. See website for details.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Lawton Home Builders Association
    Local # 3728
    PO Box 1085
    Lawton, OK 73502

    Martha Oklahoma Construction Expert Witness 10/ 10

    Builders Association of South Central Oklahoma
    Local # 3742
    210 36th Ave SW 1H
    Norman, OK 73072

    Martha Oklahoma Construction Expert Witness 10/ 10

    Home Builders Association of Moore City
    Local # 3736
    2109 Lincoln
    Moore, OK 73160
    Martha Oklahoma Construction Expert Witness 10/ 10

    Southern Oklahoma Builders Association
    Local # 3711
    PO Box 2532
    Ardmore, OK 73402
    Martha Oklahoma Construction Expert Witness 10/ 10

    Home Builders Association of Shawnee (Oklahoma)
    Local # 3777
    2510 E Independence Ste 400
    Shawnee, OK 74804

    Martha Oklahoma Construction Expert Witness 10/ 10

    Oklahoma State Home Builders Association
    Local # 3700
    917 NE 63rd St
    Oklahoma City, OK 73105

    Martha Oklahoma Construction Expert Witness 10/ 10

    Greater Sequoyah County Chapter
    Local # 3787
    2031 Breckenridge
    Sallisaw, OK 74955
    Martha Oklahoma Construction Expert Witness 10/ 10


    Construction Expert Witness News and Information
    For Martha Oklahoma


    “Professional Best Efforts” part 2– Reservation of Rights for Engineers who agree to “best” efforts? (law note)

    LA’s Backyard-Home Boom Offers Wildfire-Hit Residents New Option

    99-Year-Old Transmission Tower Seen as Possible Cause of Devastating Calif. Wildfire

    WATCH: 2023 Construction Economic Update and Forecast

    Staten Island Villa Was Home to Nabisco 'Nilla' Wafer Inventor

    U.S. Supreme Court Allows Climate Change Lawsuits to Proceed in State Court

    New Jersey’s Governor Puts Construction Firms on Formal Notice of His Focus on Misclassification of Workers as Independent Contractors

    Luxury-Apartment Boom Favors D.C.’s Millennial Renters

    Couple Claims Contractor’s Work Is Defective and Incomplete

    Number of Occurrences Is On the Agenda at This Year's ICLC Seminar

    California Supreme Court Finds Negligent Supervision Claim Alleges An Occurrence

    Ohio Condo Development Case Filed in 2011 is Scheduled for Trial

    Understanding Liability Insurer’s Two Duties: To Defend and to Indemnify

    $31.5M Settlement Reached in Contract Dispute between Judlau and the Illinois Tollway

    Discovery Requests in Bad Faith Litigation Considered by Court

    General Contractor’s Professional Malpractice/Negligence Claim Against Design Professional

    Fraud Allegations Stymie Additional Insured’s Request for a Defense

    Insurer’s Broad Duty to Defend in Oregon, and the Recent Ruling in State of Oregon v. Pacific Indemnity Company

    #6 CDJ Topic: Construction Defect Legislative Developments

    Contractor’s Coverage For Additional Insured Established by Unilateral Contract

    Pennsylvania Commonwealth Court Holds that Nearly All Project Labor Agreements are Illegal

    Credibility Matters…Even in Delay Claims

    Landmark Contractor Licensing Case Limits Disgorgement Remedy in California

    Florida Enacts Property Insurance Overhaul for Benefit of Policyholders

    Classify Workers Properly to Avoid Expensive Penalties

    The Economic Loss Rule: From Where Does the Duty Arise?

    Grupo Mexico Spill Sparks Public Scrutiny of $150 Million Mop-Up

    Trend Continues Where Unlicensed Contractors Have No Recourse

    OSHA’s Multi-Employer Citation Policy: What Employers on Construction Sites Need to Know

    Walking the Tightrope of SB 35

    How to Properly Fill Out and Use the Unconditional Waiver and Release on Progress Payment Form Used in California Construction

    Construction Halted in Wisconsin Due to Alleged Bid Issues

    Recycling Our Cities, One Building at a Time

    Yes, Indeedy. Competitive Bidding Not Required for School District Lease-Leasebacks

    Boston Water Main Break Floods Trench and Kills Two Workers

    Construction Client Advisory: The Power of the Bonded Stop Notice Extends to Expended Construction Funds

    Attorney-Client Privilege in the Age of Cyber Breaches

    Executive Order 14275: Restoring Common Sense to Federal Procurement

    "Your Work" Exclusion Bars Coverage for Contractor's Faulty Workmanship

    Get Your Contracts Lean- Its Better than Dieting

    Ceiling Collapse Attributed to Construction Defect

    Athens, Ohio, Sues to Recover Nearly $722,000 After Cyber Attack

    Real Estate & Construction News Roundup (7/31/24) – International Homebuying Shrinks Commercial Real Estate Focus on Sustainability, and U.S. Banks Boost Provisions for Credit Losses

    Subcontract Requiring Arbitration Outside of Florida

    Renee Mortimer Recognized as "Defense Lawyer of the Year" by DTCI

    Four Kahana Feld Attorneys Selected to 2026 Southern California Super Lawyers List

    Bank Sues over Defective Windows

    Construction Contract Negotiation & Drafting: A Practical Checklist (and Where State-Specific Issues Can Surprise You)

    Four Common Construction Contracts

    Home Buyers Lose as U.S. Bond Rally Skips Mortgage Rates
    Corporate Profile

    MARTHA OKLAHOMA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    The Martha, Oklahoma Construction Expert Witness Group at BHA, leverages from the experience gained through more than 7,000 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Drawing from this considerable body of experience, BHA provides construction related trial support and expert services to Martha's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.

    Construction Expert Witness News & Info
    Martha, Oklahoma

    Pulling the Plug, Preserving the Product: Protecting Rights to a Modular Subcontractor’s Work Post-Termination

    June 08, 2026 —
    Volumetric Modular Construction (VMC) is a building method where a structure is divided into large components or modules, fabricated in an offsite factory and then transported to a construction site for assembly.[1] Proponents of VMC hail it as a cost-efficient alternative to traditional building methods that leads to more consistent quality and shorter construction duration.[2] Due to a growing labor shortage, high demand for compressed project schedules, and stagnant construction productivity rates, the construction industry is embracing VMC.[3] A recent report on the market size of prefabricated construction estimates that from 2026 to 2031, VMC will grow at a compound annual growth rate of 7.16% and become a 413.11-billion-dollar industry.[4] As VMC becomes more prevalent, owners, general contractors, and subcontractors must consider how to effectively contract for modular construction. One important consideration, which this article focuses on, is navigating termination of a modular subcontractor. Read the full story...
    Reprinted courtesy of Paul Williamson, Peckar & Abramson, P.C.
    Mr. Williamson may be contacted at pwilliamson@pecklaw.com

    Congratulations to Reno Partner Karen Baytosh for Securing a Complete Dismissal via a Motion for Summary Judgment

    July 13, 2026 —
    BWB&O is proud to announce that Reno Partner Karen Baytosh received a significant victory on behalf of the firm’s Developer Client in a high-exposure personal injury matter. Plaintiff, a teenager, was struck by an intoxicated driver while walking her dog at night, sustaining catastrophic injuries requiring 24-hour critical care for the remainder of her life. Plaintiff’s Guardian brought suit against the drunk driver and her husband, the City, and BWB&O’s Developer Clients, alleging that the City and Developers failed to improve street lighting and install a sidewalk that would have prevented the accident. Read the full story...
    Reprinted courtesy of Bremer Whyte Brown & O'Meara LLP

    Cuomo Bridge Lawsuit Adversaries Weigh Mediated Settlement

    July 06, 2026 —
    Rival legal teams have reached a critical juncture as they consider a mediated settlement in one of two major payment lawsuits pending between a design-build contracting team and the New York State Thruway Authority over construction of the more than $3-billion Mario M. Cuomo Bridge north of New York City. Read the full story...
    Reprinted courtesy of Richard Korman, Engineering News-Record
    Mr. Korman may be contacted at kormanr@enr.com

    2026 Top Business Risks for Construction and Engineering Companies

    May 26, 2026 —
    The 2026 Allianz Risk Barometer revealed some surprising findings for construction and engineering businesses. Now in its fifteenth year, this annual business risk ranking by corporate insurer Allianz Commercial incorporates the views of 3,338 global risk management professionals on the main perils on their radar for the year. Survey respondents included construction and engineering risk experts who identified the threats keeping them up at night. Here is how they ranked the top industry risks for 2026: Natural Catastrophes Natural catastrophe risk retains the top spot, with 38% of construction and engineering respondents citing this risk as their leading concern for 2026. From the insurance perspective, economic and insured losses remained high, albeit lower than the 10-year average. The evolving nature of natural catastrophes continues to pose significant challenges to businesses and the (re)insurance industry. Insured losses from natural catastrophes are set to reach $107 billion for 2025, according to Swiss Re—the sixth year in a row they have exceeded $100 billion, while economic losses are well in excess of $200 billion. Reprinted courtesy of Darren Tasker, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    Trend Continues Where Unlicensed Contractors Have No Recourse

    July 13, 2026 —
    There’s been a recent trend in Florida case law that has figuratively “killed” unlicensed contractors. Here’s another one. The moral to this trend and case is simple: make sure you have the proper licenses prior to serving as a contractor under Florida law. Trying to be cute, as seemed to be the situation in this case with a creative argument, is not an argument that will carry the day and your resources will be devoted to being creative versus the ultimate merits of the dispute. In Ramindesign, LLC v. Skarzynski, 2026 WL 1649571 (S.D.Fla. 2026) an owner of real property hired a company to design and construct a spec home on the property. The company and its owner were NOT licensed contractors. The contract stated the company was serving as a “spec developer” and referred to it as the contractor throughout the contract. Other than this, the contract was set up as a cost plus a fee. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Texas Prepares to Restart Data Center Construction, with Around 300 Projects Under Review And 6,608 MW Awaiting Energization Approval, Driving Demand for Rapid-Response Lifting Operations

    October 20, 2026 —
    Texas is experiencing an unprecedented increase in power demand. The ERCOT (Electric Reliability Council of Texas) power grid reached a record peak demand of 91.1 GW in summer 2026, 6% above the previous record, according to the U.S. Energy Information Administration (EIA). This is compounded by interconnection requests totaling around 474 GW, more than five times the record peak, with approximately 90% of these requests related to data centers, according to the Office of the Governor of Texas. Within this context, authorities have launched a comprehensive review process. In August , the Governor directed the Public Utility Commission of Texas (PUCT) and ERCOT to audit all data centers progressing toward grid connection, covering around 300 projects. ERCOT has also suspended approvals to energize data centers of 75 MW or more and has set December 10 as the date for the publication of its reports. For the industry, this pause creates a valuable planning window. Goldman Sachs notes that it takes 18 to 24 months to build a data center once permits have been secured, while only 50% to 60% of planned capacity is delivered on schedule. Supply chain constraints and labor shortages are among the most common causes of delays. In this context, construction agility is becoming increasingly critical. A one-month delay at a typical 60 MW U.S. data center is estimated to cost up to $14.2 million in lost revenue, additional costs and penalties, according to STL Partners data. Against this backdrop, Sarens, which has operated in the U.S. since 2009 and is headquartered in Houston, with offices also in Odessa and Beaumont, positions as a logistics partner for developers and contractors preparing for the execution phase. Read the full story...
    Reprinted courtesy of Sarens

    EPA, Maryland Sue DC Water Over Massive Potomac River Sewage Spill

    May 14, 2026 —
    The state of Maryland and the federal government have filed separate lawsuits against the District of Columbia Water and Sewer Authority (DC Water), both alleging that the agency’s failure to address longstanding deterioration in the Potomac Interceptor contributed to a weeklong release of more than 240 million gallons of raw sewage into the Potomac River this past January. Read the full story...
    Reprinted courtesy of Jim Parsons, Engineering News-Record
    ENR may be contacted at enr@enr.com

    Not Every Job Is Worth Winning: Contract Risk Questions Contractors Should Ask Before They Bid

    September 29, 2026 —
    Introduction Winning the work is not the same as winning the project, at least financially. Consider a contractor that commits to procure custom or long-lead materials before receiving complete construction documents. Depending on the language of the contract, if the final design is altered after those materials have been ordered, the contractor may be left responsible for replacement costs, procurement delays, or both. Alternatively, a subcontractor that accepts a pay-if-paid provision without investigating the owner’s financing, or prematurely waives lien rights, potentially risks nonpayment for properly performed work. Such concessions can quickly transform an apparently profitable project into a significant financial burden. A successful bid can therefore become an unsuccessful project if the contractor accepts contractual “red flags” without evaluating their consequences and the long-term financial impacts that they may have. The significance of each risk will depend on the project, the parties, the proposed contract, applicable law, and the contractor’s business objectives. Although not comprehensive, this article identifies several key considerations for that process to help mitigate certain risks. Read the full story...
    Reprinted courtesy of Jack Mayo, Jones Walker LLP
    Mr. Mayo may be contacted at jmayo@joneswalker.com