BERT HOWE
  • Nationwide: (800) 482-1822    
    low-income housing expert witness Marion North Dakota parking structure expert witness Marion North Dakota custom home expert witness Marion North Dakota institutional building expert witness Marion North Dakota office building expert witness Marion North Dakota industrial building expert witness Marion North Dakota custom homes expert witness Marion North Dakota mid-rise construction expert witness Marion North Dakota concrete tilt-up expert witness Marion North Dakota high-rise construction expert witness Marion North Dakota production housing expert witness Marion North Dakota Medical building expert witness Marion North Dakota housing expert witness Marion North Dakota condominiums expert witness Marion North Dakota tract home expert witness Marion North Dakota retail construction expert witness Marion North Dakota landscaping construction expert witness Marion North Dakota multi family housing expert witness Marion North Dakota Subterranean parking expert witness Marion North Dakota townhome construction expert witness Marion North Dakota casino resort expert witness Marion North Dakota hospital construction expert witness Marion North Dakota
    Marion North Dakota hospital construction expert witnessMarion North Dakota stucco expert witnessMarion North Dakota roofing and waterproofing expert witnessMarion North Dakota construction claims expert witnessMarion North Dakota building expertMarion North Dakota construction code expert witnessMarion North Dakota defective construction expert
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Marion, North Dakota

    North Dakota Builders Right To Repair Current Law Summary:

    Current Law Summary: (HB1437) Notice required six months prior to undertaking any repair other than emergency repair, or instituting action for breach of warranty of one or two-family dwelling; response time 30 days.


    Construction Expert Witness Contractors Licensing
    Guidelines Marion North Dakota

    A contractor's license is required for all jobs over $2,000.00. Separate boards license plumbing and electrical trades.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Home Builders Association of Fargo-Moorhead
    Local # 3545
    1802 32nd Ave S
    Fargo, ND 58103

    Marion North Dakota Construction Expert Witness 10/ 10

    Dickinson Area Home Builders Association
    Local # 3512
    PO Box 1697
    Dickinson, ND 58602
    Marion North Dakota Construction Expert Witness 10/ 10

    North Dakota AB
    Local # 3500
    1720 Burnt Boat Dr Ste 207
    Bismarck, ND 58503

    Marion North Dakota Construction Expert Witness 10/ 10

    Bismarck-Mandan Home Builders Association
    Local # 3510
    2600 Gateway Ave Ste 1
    Bismarck, ND 58503

    Marion North Dakota Construction Expert Witness 10/ 10

    Forx Builders Association
    Local # 3515
    519 DeMers Ave
    Grand Forks, ND 58201

    Marion North Dakota Construction Expert Witness 10/ 10

    Williston Area Builders Association
    Local # 3520
    PO Box 1825
    Williston, ND 58802
    Marion North Dakota Construction Expert Witness 10/ 10

    Minot Association of Bldrs
    Local # 3565
    PO Box 1851
    Minot, ND 58702

    Marion North Dakota Construction Expert Witness 10/ 10


    Construction Expert Witness News and Information
    For Marion North Dakota


    Mass Timber Reduces Construction’s Carbon Footprint, But Introduces New Risk Scenarios

    Homeowner Survives Motion to Dismiss Depreciation Claims

    More In-Depth Details on the Davis-Bacon Act Overhaul

    Big Bertha Lawsuits—Hitachi Zosen Weighs In

    In UK, 16th Century Abbey Modernizes Heating System by Going Back to Roman Times

    New Jersey Law regarding Prior Expert’s Testimony

    Court of Appeals Discusses Implied Duty of Good Faith and Fair Dealing in Public Works Contracting

    “If It Walks Like A Duck . . .” – Expert Testimony Not Always Required In Realtor Malpractice Cases Where Alleged Breach Of Duty Can Be Easily Understood By Lay Persons

    Judge's Order Halts Google Data Center Project in Minnesota

    Surety Liability Is Coextensive with Its Bond Principal

    Coverage Doomed for Failing Obtain Insurer's Consent for Settlement

    Florida’s Third District Court of Appeal Suggests Negligent Repairs to Real Property Are Not Subject to the Statute of Repose

    How Long is Your Construction Warranty?

    Insurance Measures Passed by 2015 Hawaii Legislature

    How Mansions Can Intensify Wildfires

    Tightest Credit Market in 16 Years Rejects Bernanke’s Bid

    New Jersey Court Adopts Continuous Trigger for Construction Defect Claims

    Maryland Contractor Documents its Illegal Deal and Pays $2.15 Million to Settle Fraud Claims

    Home Builders and Developers Beware: SC Supreme Court Beats Up Hybrid Arbitration Clauses Mercilessly

    Acceptable Worksite: New City of Seattle Specification Provisions Now In Effect

    Construction and Design Contracts—They Are More Important Than You Might Think! (Law Note)

    Yes, Virginia, Contract Terms Do Matter: Financing Term Offers Owner an Escape Hatch

    Hunton Insurance Lawyer, Adriana Perez, Selected to the National Association of Women Lawyers’ 2023 Rising List

    Resolving Condominium Construction Defect Warranty Claims in Maryland

    School System Settles Design Defect Suit for $5.2Million

    Structural Failure of Precast-Concrete Span Sets Back Sydney Metro Job

    Seller's Silence on Unfinished Repairs Sinks Summary Judgment in Real Estate Dispute

    Nine ACS Lawyers Recognized by Best Lawyers®

    Suffolk Construction Drywall Suits Involve Claim for $3 Million in Court Costs

    It is Time to Assess Your Strategy

    Los Angeles Wildfires Rage on, Destroying Structures and Displacing Residents

    Best Lawyers Honors Hundreds of Lewis Brisbois Attorneys, Names Four Partners ‘Lawyers of the Year’

    Jurisdictional Conflict Over “Related Claims”: Montana Federal Court Latest to Weigh in on When Claims Are Related

    Water Leak Covered for First Thirteen Days

    California Supreme Court Approves of Annual Civility Oath for Attorneys, Rejects Incivility As Basis for Disciplinary Measures

    Court Narrowly Interprets “Faulty Workmanship” Provision

    Governmental Action Exclusion Bars Claim for Damage to Insured's Building

    Payne & Fears Recognized by Best Lawyers in 2026 Best Law Firms®

    Risk-Shifting Tactics for Construction Contracts

    Mediation Success – Strategies for Avoiding Prolonged Litigation and Getting To “Settled”

    Texas Voids Out-of-State Forum and Choice of Law Clauses in Construction Contracts

    Environmental Justice Update: The Justice40 Initiative

    The Legal Landscape

    Risk Associated with Design-Build Project Delivery Method

    Construction Defect Leads to Death, Jury Awards $39 Million

    When Construction Defects Appear, Don’t Choose Between Rebuilding and Building Your Case

    Augmented and Mixed Reality in Construction

    Why Construction Tendering Needs Specialized Intelligence

    Golden Gate Bridge's $76 Million Suicide Nets Near Approval

    Chambers USA 2022 Ranks White and Williams as a Leading Law Firm
    Corporate Profile

    MARION NORTH DAKOTA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Leveraging from more than 7,000 construction defect and claims related expert witness designations, the Marion, North Dakota Construction Expert Witness Group provides a wide range of trial support and consulting services to Marion's most acknowledged construction practice groups, CGL carriers, builders, owners, and public agencies. Drawing from a diverse pool of construction and design professionals, BHA is able to simultaneously analyze complex claims from the perspective of design, engineering, cost, or standard of care.

    Construction Expert Witness News & Info
    Marion, North Dakota

    Data Center Construction: Contractors Must Step Up

    May 26, 2026 —
    I attended the Datacenter Forum 2026 in Helsinki last week. Over 400 people packed the room. Walking out, I had one overriding thought: Is construction operating in a different century from the technology it is being asked to house? Is Our Industry on Par? Ciarán Forde, Senior Vice President at CTS Nordics, opened the forum with a statement that set the tone for everything that followed: data centers are no longer just a technical challenge; they are a national strategy. Before AI, Ciarán had worked in telecoms, where data centers were already complex. But now, he said flatly, everything has changed, and the industry must rethink everything. The numbers behind the claim are staggering. Current AI data center racks run at 40 to 100 kW. In three years, 800 kW per rack is on the roadmap. And the development cycle for a new chip is roughly one year, which means deployments begin aging out almost as soon as they are commissioned. Read the full story...
    Reprinted courtesy of Aarni Heiskanen, AEC Business
    Mr. Heiskanen may be contacted at aec-business@aepartners.fi

    PJM’s Reliability Backstop Procurement Proposal—Fast-Track Capacity to Meet Rising Large-Load Demand

    May 12, 2026 —
    In January, we discussed the Statement of Principles jointly signed by the National Energy Dominance Council and governors across the mid-Atlantic region—framing accelerating demand (especially from large-scale data centers) as an emergency reliability issue for PJM Interconnection, L.L.C. (PJM), the nation’s largest power grid operator. That policy signal is now becoming a near-term, accelerated procurement and contracting exercise. On April 8, 2026, PJM notified stakeholders of a critical issue fast path reliability backstop procurement process. PJM subsequently released a request for information (RFI) with respect to a proposed Reliability Backstop Procurement (RBP)—a one-time mechanism intended to attract significant new capacity to address projected reliability shortfalls driven by large-load growth. RBP compresses what is often a multiyear market and regulatory conversation into a fast-moving set of commercial choices. Developers, large loads, utilities and capital providers should be preparing now for (i) an accelerated bilateral contracting window and (ii) a standardized PJM-led backstop procurement if bilateral deals do not clear enough capacity. Reprinted courtesy of Stephen J. Humes, Pillsbury, Alicia M. McKnight, Pillsbury, Jason Drogin Atwood, Pillsbury and Andrew H. Jacobs, Pillsbury Mr. Humes may be contacted at stephen.humes@pillsburylaw.com Ms. McKnight may be contacted at alicia.mcknight@pillsburylaw.com Mr. Atwood may be contacted at jason.atwood@pillsburylaw.com Mr. Jacobs may be contacted at andrew.jacobs@pillsburylaw.com Read the full story...

    Appeals Court Upholds Skanska, Granite Win in ‘I-4 Ultimate’ JV Dispute

    June 15, 2026 —
    A federal appeals court has upheld a lower court’s decision requiring The Lane Construction Corp. to pay roughly $79 million in damages, plus interest, to joint venture partners Skanska USA Civil Southeast and Granite Construction for work on Florida’s I-4 Ultimate highway megaproject in Orlando, which was completed in 2022. Read the full story...
    Reprinted courtesy of Bryan Gottlieb, Engineering News-Record
    Mr. Gottlieb may be contacted at gottliebb@enr.com

    Building More Than a Ramp: HHMR and the Home Builders Foundation

    September 15, 2026 —
    Last Friday, four members of the Higgins, Hopkins, McLain & Roswell team traded briefs, depositions, and construction litigation files for lumber, drills, and a day on a jobsite. HHMR attorneys Ricky Nolen, Amanda Tynan, Kyle Thompson, and Tanner Davis participated in the Home Builders Foundation’s 2026 Blitz Build, helping construct an accessibility ramp for Andrea, a Denver-area resident whose mobility challenges had made something most of us take for granted extraordinarily difficult: leaving her own home independently. The day after the build, the volunteers received an e-mail from HBF’s Terrina Reiber with an unusual request: set an alarm for 10:00 the next morning. At 10:00 on a Saturday, she explained, they might be running errands, meeting a friend, or simply deciding what to do with the day. When the alarm went off, she asked them to think about Andrea. Because Andrea could now make that same choice. Read the full story...
    Reprinted courtesy of Higgins, Hopkins, McLain & Roswell

    In-House Insight at CSC

    October 26, 2026 —
    Elaine Y. Lee, Partner in P&A’s Los Angeles office, sat down with Third Thursday to discuss effective collaboration with in-house counsel, strategies for resolving construction disputes, and the factors that can help determine the best path forward. This discussion previews her upcoming Construction Super Conference panel, “Same But Different: How In-House Legal Teams Vary in Approach, Role, and Decision-Making,” on December 2nd. Read the full story...
    Reprinted courtesy of Elaine Y. Lee, Peckar & Abramson, P.C.
    Ms. Lee may be contacted at elee@pecklaw.com

    Nomos LLP Partner Garret Murai Recognized by Best Lawyers in America

    September 08, 2026 —
    Nomos LLP partner Garret Murai has been recognized in the 2027 edition of The Best Lawyers in America® in the area of Construction Law. Only about 5% of lawyers in the United States are recognized by Best Lawyers in America®. Read the full story...
    Reprinted courtesy of Garret D. Murai, Nomos LLP
    Mr. Murai may be contacted at gmurai@nomosllp.com

    Construction Attorneys: Contract Negotiation Strategy

    September 01, 2026 —
    Contract negotiation is where project expectations become enforceable business obligations. A reasonable bid can become a high-risk agreement when the final contract expands the scope, shortens notice periods, limits payment rights or transfers liability that was never included in the price. Construction attorneys help project leaders identify those consequences before execution. Their role is not to eliminate every risk or prolong negotiations. It is to determine which risks can be controlled, insured, priced, shared or rejected while preserving a workable deal. The financial stakes can be substantial. HKA's 2025 analysis of more than 2,200 distressed construction and engineering projects found that disputed costs averaged 33.4% of contract budgets. Scope changes affected more than 28% of the projects studied and remained the most common cause of conflict. In North America, the average dispute studied by Arcadis in 2024 had a value of $60.1 million and took 12.5 months to resolve. Reprinted courtesy of Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    Urban Digital Twins: How Virtual Cities Could Help Build Smarter Cities

    August 11, 2026 —
    Traffic congestion, endless construction, flooded streets and power outages. For city leaders and residents alike, these disruptions are simply part of daily urban life. But an emerging tool, known as the urban digital twin, could help cities anticipate problems before they occur by allowing planners to simulate responses, stress-test infrastructure, and evaluate decisions before implementing them in the real world. What Is an Urban Digital Twin? An urban digital twin is a dynamic, data-driven virtual model of a real city. It uses AI analytics and combines 3D modeling with real-time data and information from sources such as IoT sensors, traffic cameras, satellite feeds, infrastructure databases, utility networks, and environmental data including weather systems and heat maps to create a continuously updated digital representation of the urban environment that mirrors infrastructure, movement and systems in real time. In other words, it is a living digital replica of a city. Read the full story...
    Reprinted courtesy of Pillsbury