Tampa Team Obtains Highly Favorable Verdict for Property Owner Client in Lawsuit over Traffic Accident
March 24, 2026 —
Lewis Brisbois NewsroomTampa Managing Partner John Rine and Partner Nick Dareneau obtained a very favorable verdict for their property owner client in a Sarasota County trial in a lawsuit arising from a traffic accident. At the end of closing arguments, plaintiff’s counsel requested appropriately $18 million from the jury. The jury returned a net verdict of just over a thousand dollars.
The plaintiff was on a scooter and was involved in an accident with an SUV in a parking lot intersection. Our firm represented the property owner. The plaintiffs argued that the landscape vegetation was too tall and violated the sight lines of the two drivers, and that the height of the shrubbery violated the owner’s landscaping contract and a local sight line ordinance. They also argued that the intersection lacked a stop sign in contrast to the other six parking lot entrances, which had stop signs.
Read the full story...Reprinted courtesy of
Lewis Brisbois
Beyond the Storm: How Non-Hurricane Catastrophes Expose Florida’s Construction Defect Blind Spot
August 11, 2026 —
Franchesco “Frank” Soto & Amanda L. Gonzalez - Ball JanikOn June 8, 2026, a magnitude 6.1 earthquake struck the Gulf near the coast of Cuba, the largest instrumentally recorded earthquake in the Gulf since seismic monitoring began in 1950. Buildings swayed, offices were evacuated, and many residents along the east coast of Florida, from Miami-Dade to Jacksonville, felt the ground shake. Although no tsunami followed and reported structural damage was limited, this event exposed a blind spot that Florida property owners, developers, and their counsel cannot afford to ignore: catastrophic stress on Florida buildings does not always come in the form of a named storm.
Florida property owners have grown accustomed to preparing for wind, storm surge, floods, and torrential rain. Far less attention is paid to earthquakes, sinkholes, tornadoes, hail, and non-tropical flooding, each of which can place unexpected stress on buildings not designed with those forces top of mind and can trigger deficiencies in buildings that were not otherwise known, expose design failures, and create an urgency for both insurance claims and subsequent litigation.
Non-Hurricane Triggers of Latent Defects
Seismic activity is the clearest example. Florida’s building code accounts for wind loads, not seismic forces, meaning even a moderate earthquake can reveal weaknesses in curtain wall systems, structural connections, or foundations that were already marginal. Sinkholes, driven by Florida’s karst limestone geology, remain a persistent threat, particularly in Central Florida, where subsurface voids can undermine foundations without warning. Non-tropical flooding, like the record rainfall that flooded South Florida in June 2024, can intrude through building envelopes and waterproofing systems that were never stress-tested for such volumes of water. Tornadoes and hail, while more localized, can cause roofing and envelope failures that mimic, mask, or trigger latent construction defects.
The Litigation and Coverage Disputes That Follow
When one of these events strikes a building already carrying undisclosed or unresolved construction defects, the resulting disputes become considerably more complex. Property owners and associations must move quickly to document existing conditions and distinguish damage caused by the event from pre-existing defective construction, the same causation issue that arises in the hurricane context under Chapter 558, but often without the benefit of established precedent or adjuster experience with these less common events.
Insurance coverage disputes frequently follow close behind. Carriers may dispute whether an earthquake, flood, or other peril is covered at all, particularly where policies contain earthquake or flood exclusions requiring separate endorsements, or anti-concurrent causation language that can bar coverage entirely when a covered peril combines with an uncovered one, such as pre-existing defective construction, to cause a loss. Sinkhole claims carry their own statutory framework under Florida law, requiring specific testing protocols and reporting before a claim is compensable. Developers and contractors, in turn, may find themselves defending Chapter 558 claims while simultaneously litigating with their own carriers over defense and indemnity obligations.
Practical Risk Mitigation Strategies
Property owners, associations, and developers can take several concrete steps to reduce their exposure. First, maintain thorough documentation, including engineering reports, maintenance logs, and photographs, well before any event occurs. This documentation is often the deciding factor in causation disputes. Second, engage structural engineers and consultants immediately following any seismic event, unusual flooding, or storm damage, regardless of whether a hurricane is involved. Prompt inspection preserves evidence and can help prevent inadvertent waiver of construction defect claims. Third, review insurance policies regularly with counsel or a broker to confirm earthquake, flood, and sinkhole coverage matches the property’s actual risk profile, rather than assuming a standard property policy responds to every peril. Fourth, avoid rushing to remediate before conditions are documented and/or before consulting counsel. Well-intentioned repairs can inadvertently compromise evidence needed to prove a defect claim.
The June earthquake was a reminder that Florida’s catastrophic risk profile extends beyond hurricane season. Property owners, associations, and developers who build readiness plans around all forms of catastrophic stress, not just named storms, will be far better positioned when the next unexpected event occurs.
Franchesco “Frank” Soto is a partner in
Ball Janik’s Construction Defect Practice Group in Miami. He may be reached at fsoto@balljanik.com.
Amanda L. Gonzalez is a litigation attorney in
Ball Janik’s Construction Defect Practice Group in Miami. She may be reached at agonzalez@balljanik.com.
A Green Light for Housing? What Executive Order 14394 Means for Your Next Project
May 26, 2026 —
Bennett Houck, Miranda Martinez & Byron Sarhangian - Snell & WilmerOn March 13, 2026, President Trump signed Executive Order 14394, “Removing Regulatory Barriers to Affordable Home Construction” (the “Order”). The Order directs federal agencies to reduce regulatory burdens on residential development, streamline environmental permitting, and encourage state and local governments to adopt housing-friendly policies.
The Order includes several key provisions that developers and homebuilders should be aware of moving forward.
Key Provisions
The Order targets four main areas:
1. Federal Environmental Regulations
First, it directs the Secretary of the Army and Environmental Protection Agency (EPA) to revise permitting standards, including stormwater permits, wetlands permits under Section 404 of the Clean Water Act, and related construction-site requirements. The Order also targets energy-efficiency mandates for U.S. Department of Housing and Urban Development (HUD) and U.S. Department of Agriculture (USDA) financed housing. For developers and homebuilders, these revisions could reduce project delays and compliance costs associated with stormwater management, wetlands mitigation, and energy-efficiency upgrades, expenses that often add significant time and cost to residential development projects.
Reprinted courtesy of
Bennett Houck, Snell & Wilmer,
Miranda Martinez, Snell & Wilmer and
Byron Sarhangian, Snell & Wilmer
Mr. Houck may be contacted at bhouck@swlaw.com
Ms. Martinez may be contacted at mimartinez@swlaw.com
Mr. Sarhangian may be contacted at bsarhangian@swlaw.com
Read the full story...
White and Williams LLP Secures a Clean Sweep Dismissal of Architect's Professional Liability Coverage Lawsuit
August 16, 2026 —
Daniel E. Bryer & Brendaliz Minaya Ruiz - White and Williams LLPWhite and Williams LLP achieved a complete dismissal of professional liability coverage claims through a strategic defense led by Insurance Coverage and Bad Faith Practice Group attorneys Daniel E. Bryer, Partner and Brendaliz Minaya Ruiz, Associate.
In a nuanced action styled, Vincent Cusumano Architect P.C., et al. v. Berkshire Hathaway Direct Insurance Company, et al., decided in the U.S. District Court for the District of New Jersey, plaintiffs asserted twelve pre-contractual and contractual-based causes of action against their liability insurer, Berkshire Hathaway Direct Insurance Company, and its insurance agent (collectively, “Defendants”) for denying a professional liability claim arising from plaintiffs’ prior work.
Reprinted courtesy of
Daniel E. Bryer, White and Williams LLP and
Brendaliz Minaya Ruiz, White and Williams LLP
Mr. Bryer may be contacted at bryerd@whiteandwilliams.com
Ms. Ruiz may be contacted at minayaruizb@whiteandwilliams.com
Read the full story...
Ownership and Licensing in Design Agreements
April 14, 2026 —
Abby Dvorkin - Snell & WilmerThe ownership and licensing of design documents in professional services agreements play a significant role in protecting the interests of the design professional and the project owner during and after project completion. The ownership or licensing of the drawings provision typically outlines who owns the drawings and specifications, who can use the documents, and how the documents can be used during and after the project.
Project owners and developers should understand that payment for design services does not automatically transfer ownership or an exclusive right to use the professional design. Under U.S. copyright law, the default rule is that the design professional retains ownership of the instruments of service absent a contractual provision transferring ownership or a license. See 17 U.S.C. § 101, et seq. The Architectural Works Copyright Protection Act provides that copyright protection applies to “pictorial, graphic and sculptural works” and includes “architectural works.” 17 U.S.C. § 102. A design professional may only transfer copyright ownership in writing. 17 U.S.C. § 204(a).
Read the full story...Reprinted courtesy of
Abby Dvorkin, Snell & WilmerMs. Dvorkin may be contacted at
advorkin@swlaw.com
Insurer Granted Summary Judgment on Claim for Roof Damage Caused by Windstorm
May 26, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer successfully moved for summary judgment, eliminating the insured’s claim for roof damage due to windstorm. Mulas v. Westchester Surplus Lines Ins. Co., 2026 U.S. Dist. LEXIS 20537 (Jan. 30, 2026).
The insureds’ commercial property sustained windstorm damage during Hurricane Ian. Westchester denied the claim. The insureds believed Westchester wrongfully denied coverage for roof damage and various interior damage to property. The insureds also argued that Westchester’s actual cash value (ACV) payment did not reflect the fully insured loss.
The insureds sued and Westchester moved for summary judgment. Westchester argued the roof damage was not covered because Hurricane Ian did not cause the damage. Westchester hired an engineer who determined the roof damage was not caused by wind from Hurricane Ian. Westchester pointed out that the insureds’ expert also found no wind damage on the roof. The insureds offered no other evidence suggesting the hurricane caused roof damage. Therefore, the insureds could not show that Westchester breached the policy by denying coverage.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
New Report Outlines Roadmap for Construction Jobsites to Cut Carbon Emissions by 2040
April 20, 2026 —
PCL ConstructionDenver, Colo., April 16, 2026 (GLOBE NEWSWIRE) -- A new industry report outlines five practical steps that, when implemented together, could reduce construction jobsite emissions by up to 75% without compromising cost, schedule or performance. Grounded in real operational data from 617 construction projects across the U.S. and Canada, Growing and Greening Canadian Construction represents the most comprehensive sector-wide analysis of jobsite emissions conducted to date.
The report was developed through a collaboration among leading general contractors, including
PCL Construction, in partnership with the Transition Accelerator, an organization that drives projects, partnerships, and strategies to promote economic competitiveness in a carbon‑neutral world. The report focuses specifically on emissions from construction jobsite activities and reflects a shared commitment to advancing practical, scalable solutions for the industry.
About PCL Construction
PCL is a group of independent construction companies that operates throughout the United States, Canada, the Caribbean and Australia. As one of the largest contracting organizations in North America, PCL completes more than $9.9 billion USD in work annually, building projects that shape communities. The company’s 100% employee ownership model fuels a culture of commitment for clients in the buildings, civil infrastructure, heavy industrial and solar markets. With a strategic presence in more than 30 major centers, PCL’s leadership teams consistently drive innovation and set new benchmarks for excellence, bringing unparalleled skill to every project. Watch us build at PCL.com.
About the Transition Accelerator
The Transition Accelerator works with 300+ partner organizations across Canada to build out pathways to a prosperous low-carbon economy and avoid costly dead-ends along the way. We help governments and industry harness the global shift towards clean growth to secure permanent jobs, abundant energy, and strong regional economies across the country. By connecting systems-level thinking with real-world analysis, we’re enabling a more affordable, competitive, and resilient future.
Read the full story...
Delay Matters: Florida’s Fourth DCA Reverses Hurricane Irma Dismissal
June 08, 2026 —
Andrea DeField, Machaella Reisman & Cary D. Steklof - Hunton Insurance Recovery BlogThe mantra “delay, deny, defend” is frequently referenced in discussions of insurance claims handling, though insurers will invariably disavow these tactics. While it would be facially improper for an insurer to delay a coverage decision to gain a tactical advantage, empirical examples nonetheless exist. This very dynamic was addressed by Florida’s Fourth District Court of Appeals when it handed policyholders a win in
Hypoluxo Mariner’s Cay Condo. Assoc’n, Inc. v. Underwriters at Lloyd’s London, No. 4D2024‑2250 (Fla. 4th DCA Apr. 1, 2026), reversing a trial court order dismissing a condominium association’s Hurricane Irma coverage lawsuit against its property insurer.
Delay to Run the Statute of Limitations
Following Hurricane Irma, a condominium association suffered roof and exterior envelope damage, reported an insurance claim, and submitted a sworn proof of loss to its property insurer in compliance with Florida Statute § 627.70132 (2020). The statute establishes a timeframe within which a policyholder must submit a claim for hurricane damage.
Reprinted courtesy of
Andrea DeField, Hunton Andrews Kurth LLP,
Machaella Reisman, Hunton Andrews Kurth LLP and
Cary D. Steklof, Hunton Andrews Kurth LLP
Ms. DeField may be contacted at adefield@hunton.com
Ms. Reisman may be contacted at reismanm@hunton.com
Mr. Steklof may be contacted at csteklof@hunton.com
Read the full story...