BERT HOWE
  • Nationwide: (800) 482-1822    
    townhome construction expert witness Great River New York institutional building expert witness Great River New York condominiums expert witness Great River New York mid-rise construction expert witness Great River New York retail construction expert witness Great River New York casino resort expert witness Great River New York custom home expert witness Great River New York custom homes expert witness Great River New York Subterranean parking expert witness Great River New York production housing expert witness Great River New York multi family housing expert witness Great River New York tract home expert witness Great River New York parking structure expert witness Great River New York structural steel construction expert witness Great River New York office building expert witness Great River New York condominium expert witness Great River New York low-income housing expert witness Great River New York Medical building expert witness Great River New York high-rise construction expert witness Great River New York landscaping construction expert witness Great River New York concrete tilt-up expert witness Great River New York industrial building expert witness Great River New York
    Great River New York expert witnesses fenestrationGreat River New York construction claims expert witnessGreat River New York construction scheduling and change order evaluation expert witnessGreat River New York architectural engineering expert witnessGreat River New York OSHA expert witness constructionGreat River New York architect expert witnessGreat River New York architectural expert witness
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Great River, New York

    New York Builders Right To Repair Current Law Summary:

    Current Law Summary: Case law precedent


    Construction Expert Witness Contractors Licensing
    Guidelines Great River New York

    State license is required for Asbestos Abatement. All other licensing is done at the local level. Businesses must register with the Secretary of State.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Associated Builders & Owners
    Local # 3392
    80 Maiden Lane Ste 1503
    New York, NY 10038

    Great River New York Construction Expert Witness 10/ 10

    Queens & Bronx Building Association
    Local # 3365
    16-66 Bell Blvd #745
    Bayside, NY 11360

    Great River New York Construction Expert Witness 10/ 10

    Long Island Builders Institute
    Local # 3324
    1757-8 Veterans Memorial Highway
    Islandia, NY 11749

    Great River New York Construction Expert Witness 10/ 10

    New York City Builders Association
    Local # 3354
    3225 Victory Blvd
    Staten Island, NY 10314

    Great River New York Construction Expert Witness 10/ 10

    Rockland County Bldrs & Remodelers
    Local # 3342
    8 College Ave
    Nanuet, NY 10954

    Great River New York Construction Expert Witness 10/ 10

    Builders Association of the Hudson Valley
    Local # 3348
    1161 Little Britain Rd
    New Windsor, NY 12553

    Great River New York Construction Expert Witness 10/ 10

    Southern Tier Home Builders & Rem Assoc
    Local # 3330
    2807 North St
    Endwell, NY 13760

    Great River New York Construction Expert Witness 10/ 10


    Construction Expert Witness News and Information
    For Great River New York


    Suing a Local Government in Land Use Cases – Part 1 – Substantive Due Process

    Solar Power Inc. to Build 30-Megawatt Project in Inner Mongolia

    Velazquez Framing, LLC v. Cascadia Homes, Inc. (Take 2) – Pre-lien Notice for Labor Unambiguously Not Required

    Coverage for Named Windstorm Removed by Insured, Terminating Such Coverage

    More Fun with Indemnity and Construction Contracts!

    Unravel the Facts Before Asserting FDUTPA and Tortious Interference Claims

    Ongoing Operations Exclusion Bars Coverage

    2024 Construction Law Update

    Steel Cooling: Steel Costs Steadily Decline After Pandemic Price Shock

    FAA Plans Final Regulation on Commercial Drone Use by Mid-2016

    Construction Law Client Advisory: What The Recent Beacon Decision Means For Developers And General Contractors

    Paul Tetzloff Elected As Newmeyer & Dillion Managing Partner

    Burden Supporting Termination for Default

    Courthouse Reporter Series: The Travails of Statutory Construction...Defining “Labor” under the Miller Act

    How to Properly Fill Out and Use the Conditional Waiver and Release on Final Payment Form Used in California Construction

    Contract And IP Implications Of Design Professionals Monetizing Non-Fungible Tokens Comprising Digital Construction Designs

    Reminder: FOLLOW Your Well Drafted Contract Provisions

    Tips for Contractors Who Want to Help Rebuild After the California Wildfires

    New York Court Temporarily Enjoins UCC Foreclosure Sale

    HUD Homeownership Push to Heed Lessons From Crisis, Castro Says

    Eighth Circuit Affirms Judgment for Bad Faith after Insured's Home Destroyed by Fire

    General Contractor’s Intentionally False Certifications Bar It From Any Recovery From Owner

    Partner Patrick Au Achieves a Major Arbitration Result on a Redevelopment Project in Downtown Los Angeles!

    Construction Termination Issues for the Architect and Engineer: Part 1– Introduction to the Series

    Construction Recovery Still Soft in New Hampshire

    Hirer Not Liable Under Privette Doctrine Where Hirer Had Knowledge of Condition, but not that Condition Posed a Concealed Hazard

    Lewis Brisbois’ Houston Office Selected as a 2020 Top Workplace by the Houston Chronicle

    Obama Asks for $302 Billion to Fix Bridges and Potholes

    A Court-Side Seat: A Poultry Defense, a Houston Highway and a CERCLA Consent Decree that Won’t Budge

    U.S. Supreme Court Allows Climate Change Lawsuits to Proceed in State Court

    Are You Satisfying WISHA Standards?

    A Quick Virginia Mechanic’s Lien Timing Refresher

    Construction Litigation Roundup: “You Have No Class(ification)”

    Construction Litigation Roundup: “Just Hanging Around”

    Construction Halted in Wisconsin Due to Alleged Bid Issues

    Insurer Prohibited from Bringing Separate Contribution Action in Subrogation to Rights of Suspended Insured

    Colorado Finally Corrects Thirty-Year Old Flaw in Construction Defect Statute of Repose

    Thanks to All for My 9th Straight Super Lawyers Election

    Is the Manhattan Bank of America Tower a Green Success or Failure?

    Traub Lieberman Attorneys Recognized as 2023 Illinois Super Lawyers® and Rising Stars

    Coyness is Nice. Just Not When Seeking a Default Judgment

    Smart Home Products go Mainstream as Consumer Demand Increases

    Contract Void Ab Initio: Key Insights into the KBR vs. Corps of Engineers Affirmative Defense

    The Firm Hits the 9 Year Mark!

    Judicial Economy Disfavors Enforcement of Mandatory Forum Selection Clause

    Home Prices Up in Metro Regions

    Be Strategic When Suing a Manufacturer Under a Warranty with an Arbitration Provision

    Understanding Common Risk-Shifting Provisions in Construction Contracts

    Electronic Signatures On Contracts: Are They Truly Compliant?

    Pennsylvania Superior Court Fires up a Case-By-Case Analysis for Landlord-Tenant, Implied Co-Insured Questions
    Corporate Profile

    GREAT RIVER NEW YORK CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    The Great River, New York Construction Expert Witness Group at BHA, leverages from the experience gained through more than 7,000 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Drawing from this considerable body of experience, BHA provides construction related trial support and expert services to Great River's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.

    Construction Expert Witness News & Info
    Great River, New York

    Turning Expert Services into Products

    July 20, 2026 —
    A Finnish engineering, architecture, and project consulting company, AINS Group, recently opened an online store to purchase fixed-price services. The store presents specialist work in a product-like format, with fixed service names, defined scopes, and visible prices, such as a building history report, a zoning plan cost analysis, and a technical preliminary survey for a property transaction. Is this productization a smart move or a sign that expert services are being commoditized? Read the full story...
    Reprinted courtesy of Aarni Heiskanen, AEC Business
    Mr. Heiskanen may be contacted at aec-business@aepartners.fi

    Modular Construction’s Big Boom: New Risks Outpacing Standard Contracts in Industrial Projects

    March 24, 2026 —
    Modular construction is revolutionizing the construction industry, tackling labor shortages, sustainability goals and supply-chain challenges, with the global market for modular and prefabricated construction projected to reach over $200 billion by 2030. While residential builders have embraced modular’s speed and affordability, the greatest risks—and opportunities—are emerging in the industrial sector, where project scale and complexity demand new legal strategies. In 2023, Chad Theriot explored industrial and infrastructure applications of modular construction, addressing risks like offsite fabrication and integration complexities in his article, “The Rise of Modular Construction—Impacts for Consideration.” Since that time, modular construction has continued to experience significant advancements and has been increasingly adopted by contractors across a broad spectrum of industrial and commercial projects. As modular construction continues to reshape the industrial landscape, contractors and owners alike must be mindful of the legal implications associated with its use, specifically as it relates to liability and risk allocation, regulatory compliance, quality control and upstream factors such as transportation and intellectual property concerns. Reprinted courtesy of Chad Theriot and Jack Mayo, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    GRSM Attorneys Recognized in The Best Lawyers in America® 2027

    August 24, 2026 —
    Gordon Rees Scully Mansukhani is pleased to announce that 183 of its attorneys were listed in The Best Lawyers in America© 2027 Edition, six of whom received “Lawyer of the Year” recognitions. Additionally, 49 GRSM attorneys were recognized in Best Lawyers: Ones to Watch 2027. Best Lawyers lists are compiled based on peer-review evaluations. For the 2027 edition of The Best Lawyers in America®, results were determined using millions of confidential attorney evaluations. Ones to Watch adopts the same peer-review methodology. Read the full story...
    Reprinted courtesy of Gordon Rees Scully Mansukhani

    DOI Finalizes Long-Awaited Modernization of Type A Natural Resource Damage Assessment Regulations

    August 03, 2026 —
    For nearly three decades, the U.S. Department of the Interior’s (DOI) simplified “Type A” Natural Resource Damage Assessment (NRDA) regulations were available more in theory than in practice, constrained by dated models, narrow geographic applicability and a $100,000 cap that rarely matched the economics of modern environmental claims. DOI has now finalized revisions to the Type A natural resource damages assessment procedures under 43 C.F.R. Part 11 for hazardous substance releases under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Clean Water Act (CWA), with the final rule published in the Federal Register on July 13, 2026 and scheduled to become effective August 12, 2026. As discussed previously, DOI has sought to modernize what it views as an “inefficient and inflexible” process and restore the Type A procedure to its intended role as a more streamlined pathway for smaller, less contentious NRD claims. The final rule adopts a $5 million default damages threshold, allows use above that amount if all parties agree, clarifies that Type A may be used in all environments and for all natural resource types, and removes legacy model appendices that had tethered the process to outdated formulas. Reprinted courtesy of Amanda G. Halter, Pillsbury, Ashleigh K. Myers, Pillsbury and Jillian Marullo, Pillsbury Ms. Halter may be contacted at amanda.halter@pillsburylaw.com Ms. Myers may be contacted at ashleigh.myers@pillsburylaw.com Ms. Marullo may be contacted at jillian.marullo@pillsburylaw.com Read the full story...

    Turnover Traps for Community Associations: Investigate First, Release Claims Later

    April 14, 2026 —
    Turnover of a community association from developer control to owner control is a uniquely vulnerable moment. Developers are increasingly presenting Florida condominium and homeowners’ associations with “standard” settlement or release agreements at turnover, often being framed as routine steps to finalize the transition of control. In reality, these agreements can have sweeping consequences, including the release of construction-defect claims before the association has conducted any meaningful independent evaluation. The developer has years of project knowledge and access to plans, subcontractors, and internal records. The newly elected board is just beginning to organize, obtain documents, and understand the property’s condition. Many defects, especially those involving roofing, waterproofing, windows, or structural components, are latent and not yet visible. Signing a release at this stage means the association is making a binding decision under conditions of uncertainty, without full information, to release all future potential claims. Over the last few years, there has been a rise in reports of developers offering a packaged deal: they agree to complete certain repairs, often minor punch-list or cosmetic items, and to “forgive” an alleged financial deficit (often around $50,000) supposedly owed by the association from the developer-control period. In exchange, the association is asked to sign a broad release covering all claims, including known and unknown construction defects. To a new HOA board that received their community with limited operating and reserve funds, they are left with a difficult decision to either accept the developer’s offer or assess their owners to pay this alleged debt. These agreements are occasionally presented through community management companies, which may describe them as “standard” or "routine.” Whether due to misunderstanding or influence from the developer, management companies can unintentionally reinforce the idea that signing is expected. Any recommendation provided to HOAs about whether to sign these releases could open community management to liability down the road. The best practice for both associations and community managers is to refer any agreements to be reviewed by general counsel for the association. The following two case studies illustrate the real-world consequences: Case Study One: A newly transitioned board relies on its management company to negotiate with the developer-builder to resolve irrigation issues, pond concerns, and signage deficiencies, along with forgiving an asserted financial shortfall. In exchange, the board signs a broad release covering all claims, including latent defects. Within a year, several punch-list items remain incomplete, and more serious issues arise. When the association demands completion, the developer delays, prompting the association to seek advice on how to enforce the settlement agreement. The association hires counsel to hold the developer responsible for both the previously agreed-upon items and newly identified construction defects. However, when the association brings claims against the developer, the developer points to the release of all potential construction defects in the community. Thus, the only remaining remedy is limited to enforcement of the specific punch-list terms. The community, still relatively new, has no viable claims against the developer-builder for the construction defects. With warranties expired and the release, the association must fund repairs through special assessments, despite defects that would otherwise have been actionable. Case Study Two: A community is presented with a similar agreement as above. The management company encourages execution, suggesting it is standard and even telling the board to “name your price.” The developer also pressures the newly elected board to sign. Instead of signing, the board consults with their attorney. Counsel advises the board not to sign the release and recommends further investigation. Engineers are retained and identify early indicators of broader issues, including stucco cracking, water intrusion, and irrigation deficiencies. Based on this information, the association declines to sign the release. Subsequent evaluation reveals potentially significant construction-defect claims, allowing the community to pursue recovery that would have been lost under the proposed agreement. These scenarios underscore a fundamental point: signing a release at turnover is not an administrative formality—it is a major legal decision. Board members act in a fiduciary capacity on behalf of their community, and their decisions can bind all current and future owners. At turnover, an association’s right is to investigate and pursue claims. Preserving that right until a full and independent evaluation is completed is not adversarial—it is responsible governance. Accordingly, associations should retain independent evaluations of the property and consult qualified legal counsel before signing any “standard” agreements, especially ones involving a release of future claims. Nicholas B. Vargo is a partner in Ball Janik LLP’s Construction Practice Group. He may be reached at nvargo@balljanik.com.

    Are “Financial Hardship” Damages Recoverable?

    June 08, 2026 —
    In a case out of the Civilian Board of Contract Appeals, F.O.G., LLC v. Department of the Interior, CBCA 8203, 2026 WL 1191881 (CBCA 2026) a contractor claimed damages that included “financial hardship” damages due to slow payments. The financial hardship damages included personal damages to the contractor’s president and his wife. Are these damages recoverable? Drumroll…The Board ruled that the contractor cannot recover such financial hardship damages. As it relates the personal financial hardship damages, the Board ruled, “Neither [the contractor’s] president nor his wife are a party to this contract, are in privity of contract with [the government], or are the beneficiaries under this contract. [The contractor], therefore, cannot recover for any losses that either one has suffered individually and that [the contractor] claimed in this appeal.” F.O.G., LLC, supra. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Newark Team Obtains Appellate Ruling Affirming Summary Judgment for Lawyer and Firm in Professional Negligence Lawsuit

    April 14, 2026 —
    Newark Partner Meredith Kaplan Stoma and Associate Anthony Doss recently secured a decision from the New Jersey Superior Court, Appellate Division, affirming summary judgment for their clients, a lawyer and her firm, in a lawsuit alleging professional negligence in connection with the administration of a commercial loan. The circumstances giving rise to the lawsuit date back to September 2020, when the plaintiff was approached by members of a real estate investment company regarding a short-term loan opportunity whereby he would loan the company $200,000. The company provided the plaintiff with a “bridge loan package,” which stated that the requested funds would be held in the escrow account of their counsel and her firm (Lewis Brisbois’ clients), and returned to him with interest within six months once the company was “capitalized” by a senior lender. The company subsequently prepared two notes, each for $100,000, in connection with the agreement. Read the full story...
    Reprinted courtesy of Lewis Brisbois

    Damage from Frozen Pipes Excluded from Coverage

    March 31, 2026 —
    Applying Texas law, the federal district court found there was no coverage for damage to the insured’s commercial building due to the bursting of frozen pipes. Barona v. State Farm Lloyds, 2025 U.S. Dist. LEXIS 257379 (S.D. Texas Dec. 12, 2025). Freezing weather froze Barona’s plumbing fixtures, causing significant water damage to the commercial property when the plumbing eventually expanded and burst. State Farm sent an inspector. During the inspection, Barona stated that he turned off the heat to his building but did not shut off the water supply or drain the pipes. State Farm denied covered based on the policy’s exclusion for frozen plumbing. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com