Voluntary Dismissal of an Indemnity Claim Does Not Make the Subcontractor a “Prevailing Party,” Washington Court of Appeals Holds
September 21, 2026 —
Margarita Kutsin - Ahlers Cressman & Sleight PLLCIn
King County v. Walsh Construction Company II, LLC, No. 86503-0-I (Wash. Ct. App. Aug. 4, 2025), an unpublished decision from Division I of the Washington Court of Appeals, the Court affirmed the denial of a subcontractor’s request for prevailing-party attorney fees under an indemnity clause after the general contractor voluntarily dismissed its indemnity claims. Because the indemnity claim was no longer live and no determination of fault had occurred, the Court held that the trial court did not err in denying the request. ACS represented Walsh, the general contractor, in securing the denial of the fee request at the trial court that the Court of Appeals affirmed.
A Pass-Through Indemnity Claim That Ended Before Fault Was Decided
The dispute arose out of a public works contract under which King County hired Walsh Construction Company II, LLC (“Walsh”) to construct and install a conveyance pipeline. After the pipeline broke, King County sued Walsh for breach of contract and warranty, expressly identifying both Walsh and its subcontractor, Mears Group Inc., (“Mears”) as responsible. Walsh tendered defense and indemnity to Mears under the subcontract.
Read the full story...Reprinted courtesy of
Margarita Kutsin, Ahlers Cressman & Sleight PLLCMs. Kutsin may be contacted at
margarita.kutsin@acslawyers.com
Building the Research and Healthcare Facilities of Tomorrow Without Impacting the Progress of Today
August 16, 2026 —
Jason Tobias - Construction ExecutiveResearch labs run experiments that can’t be paused. Hospitals treat patients around the clock. Yet these same facilities constantly need upgrades—new infrastructure, modernized systems, renovated spaces—to meet the demands of twenty-first century science and medicine. The challenge for construction teams isn’t just building. It’s building without ever turning the lights off.
This unique dynamic creates an environment where construction activities are happening adjacent to sensitive testing and treatment, a complex setting where disruptions can have serious consequences.
Skanska continues to successfully navigate these challenges across multiple sectors, including from occupied lab space at the
North Carolina Department of Environmental Quality’s (NCDEQ) Reedy Creek Laboratory in Raleigh to hospital corridors alongside staff and patients in various hospital locations across the country.
Reprinted courtesy of
Jason Tobias, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...
That’s a Wrap! Pennsylvania Court Holds Arbitration Clause in Online Agreement Unenforceable
May 14, 2026 —
Gus Sara - The Subrogation StrategistIn Duffy v. Tatum, 2026 Pa. Super. LEXIS 112, 2026 PA Super 41, the Superior Court of Pennsylvania (Superior Court) considered whether an arbitration provision contained in the online Terms of Service on the defendant’s website were enforceable. The plaintiff, Daniel Duffy (Duffy), visited the website of defendant, Dolly, Inc. (Dolly), to purchase moving services. Duffy selected the number of movers, items to be moved and the type of vehicle needed. To complete the booking, the website required Duffy to checkmark a box labeled “By checking this box I accept the Dolly Terms of Service.” Duffy did not have to open the link or scroll to the bottom of the agreement before being able to click on the checkmark box. The Terms of Service included an arbitration provision requiring that any dispute related to the moving services to be resolved by arbitration in accordance with the American Arbitration Association. The Terms of Service did not include any statement that the user was waiving the right to a jury trial. The Superior Court found the internet Terms of Service unenforceable.
During the moving process, an accident occurred and injured Duffy. In May 2024, Duffy and his wife sued Dolly and other related entities alleging negligence and loss of consortium. Dolly filed preliminary objections alleging that the parties agreed to alternative dispute resolution. The lower court overruled the preliminary objections, finding that Dolly’s website did not provide reasonably obvious notice of its Terms of Service to Duffy and, as such, Duffy never agreed to waive his constructional right to a jury trial. Dolly filed an appeal to the Superior Court.
Read the full story...Reprinted courtesy of
Gus Sara, White and Williams LLPMr. Sara may be contacted at
sarag@whiteandwilliams.com
"Resilient Rebuild Hub" Helps Wildfire-Impacted Homeowners Build Back Stronger
September 21, 2026 —
California Nevada Cement AssociationNEWPORT BEACH, Calif., Sept. 21, 2026 /PRNewswire/ -- When homeowners in a fire-ravaged Pacific Palisades neighborhood banded together last year to rebuild with fire-hardened materials rather than standard wood framing, they weren't just rebuilding houses: they were rewriting the playbook for how California communities can rebuild after wildfire. Today, the Building with Resilience effort is making that playbook available to every homeowner facing the same decision with the launch of its new Resilient Rebuild Hub for exploring fire resistant, non-combustible construction options.
The Resilient Rebuild Hub helps homeowners understand options for fire-resistant, concrete-based construction and connect with architects, engineers, and contractors who can build them. This includes six noncombustible building systems:
- Insulated Concrete Forms (ICF): stackable, high-density foam blocks filled with concrete which save 20-50% on monthly heating and cooling costs, reduce outside noise by up to 80%, offer exceptional earthquake performance and 4-hour fire resistance rating.
- Insulated Composite Concrete Forms (ICCF): similar formwork to ICF construction with composite materials that enhance strength, simplify installation, and improve long-term performance.
- Concrete Masonry: strong, durable wall systems used for decades across California and the U.S.
- Precast Insulated Sandwich Panels: a complete building enclosure system consisting of two layers of concrete separated by a continuous layer of rigid insulation.
- 3D Shotcrete: air-sprayed concrete for strong, fast, and versatile wall systems that enable a high degree of artistic freedom together with unparalleled fire resistance.
- 3D Concrete Printing: the cutting edge of residential construction, a large-scale robotic 3D printer "squeezes" a specialized concrete mixture layer by layer to allow for organic, curved designs that are often too expensive or impossible to build with traditional methods.
The Resilient Rebuild Hub is available now at buildingwithresilience.com/how-to-build. Each part is free to access and includes case studies, technical resources, and a directory of architects, engineers, and contractors experienced in each building method.
CNCA is a not-for-profit organization committed to developing sustainable and economical construction solutions for California and Nevada with an emphasis on the use of cement and concrete. For more information, visit www.cncement.org.
CalCIMA is a trade association for the construction and essential mineral industries in California, including aggregate, essential and rare earth minerals, ready mixed concrete, and asphalt producers. In all, there are about 70 producer member companies that include 500 production sites in every county of California. Our members also include more than 100 suppliers and service providers to the industry.
Founded in 1930, the National Ready Mixed Concrete Association (NRMCA) is the leading industry advocate with a mission to provide exceptional value for our members by responsibly representing and serving the entire ready mixed concrete industry through leadership, promotion, education and partnering to ensure ready mixed concrete is the building material of choice.
Navigating the New Frontier of Federal-State Energy Regulation: What Energy Companies Need to Know
June 08, 2026 — Ryan J. Regula - Snell & Wilmer
Introduction
The jurisdictional boundary between the Federal Energy Regulatory Commission (FERC) and the states is being actively contested, from challenges to landmark transmission planning rules to disputes over emergency cost-allocation orders, in ways that carry significant legal, financial, and operational implications for energy companies. For utilities, independent power producers, and transmission developers, understanding these dynamics is now a strategic imperative.
The Jurisdictional Divide: A Bright Line That Isn’t
The Federal Power Act divides authority between FERC and the states: FERC exercises jurisdiction over interstate transmission and wholesale electricity sales, while states retain authority over generation facilities, retail rates, and decisions about resource mix. The D.C. Circuit has regularly been called upon to “referee the Federal Power Act’s jurisdictional line separating [FERC’s] jurisdiction over the federal wholesale market and States’ jurisdiction over facilities used in local distribution.”1
Read the full story...
Reprinted courtesy of Ryan J. Regula, Snell & Wilmer
Mr. Regula may be contacted at rregula@swlaw.com
A Green Light for Housing? What Executive Order 14394 Means for Your Next Project
May 26, 2026 — Bennett Houck, Miranda Martinez & Byron Sarhangian - Snell & Wilmer
On March 13, 2026, President Trump signed Executive Order 14394, “Removing Regulatory Barriers to Affordable Home Construction” (the “Order”). The Order directs federal agencies to reduce regulatory burdens on residential development, streamline environmental permitting, and encourage state and local governments to adopt housing-friendly policies.
The Order includes several key provisions that developers and homebuilders should be aware of moving forward.
Key Provisions
The Order targets four main areas:
1. Federal Environmental Regulations
First, it directs the Secretary of the Army and Environmental Protection Agency (EPA) to revise permitting standards, including stormwater permits, wetlands permits under Section 404 of the Clean Water Act, and related construction-site requirements. The Order also targets energy-efficiency mandates for U.S. Department of Housing and Urban Development (HUD) and U.S. Department of Agriculture (USDA) financed housing. For developers and homebuilders, these revisions could reduce project delays and compliance costs associated with stormwater management, wetlands mitigation, and energy-efficiency upgrades, expenses that often add significant time and cost to residential development projects.
Reprinted courtesy of Bennett Houck, Snell & Wilmer, Miranda Martinez, Snell & Wilmer and Byron Sarhangian, Snell & Wilmer
Mr. Houck may be contacted at bhouck@swlaw.com
Ms. Martinez may be contacted at mimartinez@swlaw.com
Mr. Sarhangian may be contacted at bsarhangian@swlaw.com Read the full story...
Chambers USA Recognizes Hunton’s Insurance Coverage Practice in 2026 Guide
June 29, 2026 — Hunton Insurance Recovery Blog
Hunton is pleased to announce that its insurance coverage practice was recognized nationally for Insurance: Dispute Resolution – Policyholder in the recently released 2026 Chambers USA guide. The team also received state rankings in Florida (Insurance: Dispute Resolution), Georgia (Insurance), the District of Columbia (Insurance: Policyholder), and Massachusetts (Insurance).
In addition to the insurance team’s group recognition across multiple states, the 2026 guide included individual rankings for Lorelie “Lorie” S. Masters (USA Nationwide and District of Columbia), Latosha M. Ellis (District of Columbia), Michael S. Levine (District of Columbia), Koorosh “KT” Talieh (District of Columbia), Walter J. Andrews (Florida), Andrea DeField (Florida), Cary D. Steklof (Florida), Lawrence J. Bracken II (Georgia), and Geoffrey B. Fehling (Massachusetts).
Read the full story...
Reprinted courtesy of Hunton Andrews Kurth LLP
Inaccurate Representations Can Lead to Differing Site Conditions Claim
May 26, 2026 — David Adelstein - Florida Construction Legal Updates
In the prior posting, I discussed a case dealing with a differing site condition. In that case, the owner did not have an affirmative duty to make a representation and there was no inaccurate representation made by the owner that misled the contractor.
Well, what about when there is an inaccurate misrepresentation regarding the site? This was the circumstance in an older Florida case where a dredging contractor had a successful differing site conditions claim. See Jacksonville Port Authority v. Parkhill-Goodloe, Co., Inc., 362 So.2d 1009 (Fla. 1st DCA 1978).
The government provided inaccurate information as to the lack of rock that would be encountered during the dredging that was relied on by the dredging contractor. But the government had “superior knowledge” that there was rock in an adjacent location based on a prior claim from a contractor, yet the government did not disclose the possibility that rock could be encountered.
Read the full story...
Reprinted courtesy of David Adelstein, Kirwin Norris