Lienor Dealing With “Show Cause” Summons by Condominium Unit Owner
September 01, 2026 —
David Adelstein - Florida Construction Legal UpdatesOne of the statutory vehicles to shorten a construction lienor’s statute of limitations to foreclose on a construction lien is through a “show cause” summons that essentially requires the lienor to foreclose on the lien within 20 days from receipt of the “show cause” summons. This is a statutory procedure under Florida’s Lien Law in
Fla. Stat. s. 713.21(4). If a lienor receives a “show cause” summons and lawsuit, the lienor should, without delay, counterclaim or file a separate lien foreclosure lawsuit within the 20-day period without exception. This is provided the lienor wants to move forward with its lien. If a lienor does not, the lien will be discharged of record. If you are a lienor and receive a “show cause” summons, please immediately consult with construction counsel that can best advise you and perfect your lien rights.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Integration Can Inoculate in Utah
July 20, 2026 —
Mark O. Morris - Snell & WilmerThe Utah Court of Appeals recently reaffirmed, in the construction context, Utah’s strict approach to enforcing integration clauses to preclude parol evidence and other legal theories that would vary the written terms of a contract. In Reid v. All Surface LC, 2025 UT App 134, decided last September, the court affirmed in all respects the trial court’s grant of summary judgment based on the strength of an integration clause against a homeowner who sued a contractor for breach of contract, breach of the covenant of good faith and fair dealing, fraud, negligent misrepresentation, civil conspiracy, negligence, and breach of the implied warranty of habitability. More recently, however, the same court rejected those same arguments in Tidwell v. Jensen, 2026 UT App 13 as to tort claims arising from a used car sale.
The facts in Reid were sympathetic to the plaintiff. After being told she had a mold issue near a defective basement shower, the plaintiff solicited bids. A remediation contractor advised that while it could address the mold, the shower replacement should be handled by someone else. The plaintiff contacted All Surface LC, a shower replacement contractor. During an interview, the sales representative stated that All Surface could “do full mold remediation, tear everything out, and reframe the shower.” The plaintiff ultimately retained All Surface, expecting it would both resolve the mold issues and replace the shower.
Read the full story...Reprinted courtesy of
Mark O. Morris, Snell & WilmerMr. Morris may be contacted at
mmorris@swlaw.com
Pay-If-Paid: What You Need to Know Before Signing on the Dotted Line
August 03, 2026 —
Christian Fernandez & Matthew Racioppo - Snell & WilmerBuried deep in the fine print of a subcontract, a pay-if-paid clause may be looming. If you are a subcontractor or supplier, misreading these clauses can put your cash flow at risk. If you are an owner or general contractor, drafting them incorrectly can leave you with obligations you never intended — or unenforceable protections you were counting on.
It is more important than ever to understand when pay-if-paid clauses hold up and when they do not, as well as recent litigation and drafting trends. Whether you are negotiating a new agreement, reviewing your standard form contracts, or staring down a payment dispute, understanding how Arizona law treats pay-if-paid clauses is essential. In this article, we break down key considerations, walk through the legal standards Arizona courts apply, and offer practical tips to consider to help you protect your payment rights on the next project.
Reprinted courtesy of
Christian Fernandez, Snell & Wilmer and
Matthew Racioppo, Snell & Wilmer
Mr. Fernandez may be contacted at cfernandez@swlaw.com
Mr. Racioppo may be contacted at mracioppo@swlaw.com
Read the full story...
New Report Outlines Roadmap for Construction Jobsites to Cut Carbon Emissions by 2040
April 20, 2026 —
PCL ConstructionDenver, Colo., April 16, 2026 (GLOBE NEWSWIRE) -- A new industry report outlines five practical steps that, when implemented together, could reduce construction jobsite emissions by up to 75% without compromising cost, schedule or performance. Grounded in real operational data from 617 construction projects across the U.S. and Canada, Growing and Greening Canadian Construction represents the most comprehensive sector-wide analysis of jobsite emissions conducted to date.
The report was developed through a collaboration among leading general contractors, including
PCL Construction, in partnership with the Transition Accelerator, an organization that drives projects, partnerships, and strategies to promote economic competitiveness in a carbon‑neutral world. The report focuses specifically on emissions from construction jobsite activities and reflects a shared commitment to advancing practical, scalable solutions for the industry.
About PCL Construction
PCL is a group of independent construction companies that operates throughout the United States, Canada, the Caribbean and Australia. As one of the largest contracting organizations in North America, PCL completes more than $9.9 billion USD in work annually, building projects that shape communities. The company’s 100% employee ownership model fuels a culture of commitment for clients in the buildings, civil infrastructure, heavy industrial and solar markets. With a strategic presence in more than 30 major centers, PCL’s leadership teams consistently drive innovation and set new benchmarks for excellence, bringing unparalleled skill to every project. Watch us build at PCL.com.
About the Transition Accelerator
The Transition Accelerator works with 300+ partner organizations across Canada to build out pathways to a prosperous low-carbon economy and avoid costly dead-ends along the way. We help governments and industry harness the global shift towards clean growth to secure permanent jobs, abundant energy, and strong regional economies across the country. By connecting systems-level thinking with real-world analysis, we’re enabling a more affordable, competitive, and resilient future.
Read the full story...
Inaccurate Representations Can Lead to Differing Site Conditions Claim
May 26, 2026 —
David Adelstein - Florida Construction Legal UpdatesIn the
prior posting, I discussed a case dealing with a differing site condition. In that case, the owner did not have an affirmative duty to make a representation and there was no inaccurate representation made by the owner that misled the contractor.
Well, what about when there is an inaccurate misrepresentation regarding the site? This was the circumstance in an older Florida case where a dredging contractor had a successful differing site conditions claim. See Jacksonville Port Authority v. Parkhill-Goodloe, Co., Inc., 362 So.2d 1009 (Fla. 1st DCA 1978).
The government provided inaccurate information as to the lack of rock that would be encountered during the dredging that was relied on by the dredging contractor. But the government had “
superior knowledge” that there was rock in an adjacent location based on a prior claim from a contractor, yet the government did not disclose the possibility that rock could be encountered.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Insurer Dispenses with Bad Faith Claim on Summary Judgment
June 22, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe court granted the insurer’s motion for partial summary judgment because the insured failed to present evidence that the insurer failed to conduct a reasonable investigation. PSY Burger, LLC v. State Farm General Insurance Company, 2026 U.S. Dist. LEXIS 66991(C.D. Cal. March 20, 2026).
The insured’s commercial property suffered heavy damage from tropical storm Hilary. State Farm denied coverage to repair the damage. The insured sued State Farm alleging breach of contract and bad faith due to an inadequate investigation. Apparently, the insured did not retain an expert to opine on claims handling.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Ball Janik LLP Welcomes Construction Defect Attorney and U.S. Air Force Veteran Jake Scott to its Fort Lauderdale Office
June 02, 2026 —
Ball Janik LLPBall Janik LLP, a leading construction defect and insurance recovery law firm, has welcomed Jake Scott as an associate in its Fort Lauderdale office. Scott joins the Construction Defect Practice Group, bringing experience across construction litigation that includes construction defect, contract dispute, and negligence matters, along with a track record of representing construction professionals through depositions, court appearances, and trial preparation to support the firm's steady growth and client service statewide.
"We're excited to welcome Jake Scott to our Fort Lauderdale office and Construction Defect Practice Group," said James C. Prichard, Managing Partner at Ball Janik LLP. "We look forward to the fresh perspectives and legal solutions he will provide for community associations across South Florida."
Scott is a results-driven attorney dedicated to providing strategic counsel for complex legal challenges. He has experience managing all phases of a case, from early investigation and discovery through trial preparation and settlement negotiations.
Prior to joining Ball Janik, Scott served as an associate attorney in Fort Lauderdale, where he represented clients in construction litigation matters, handled depositions and court appearances, conducted legal research, and drafted pleadings, motions, and briefs. He also worked as an attorney in Tampa, where he represented contractors, subcontractors, and construction firms in defending claims involving construction defects, contractual disputes, and negligence, and worked closely with expert witnesses, engineers, and consultants to develop and present technical evidence.
Scott's experience representing the development and building sides of construction disputes provides a valuable, contrast-driven perspective that supports the strategic evaluation of claims and practical approaches to resolution for Ball Janik's clients.
A proud veteran, Scott served in the United States Air Force for eight years, including roles as an Airspace Control Officer and in Space Systems Operations, supporting safe space flight operations and satellite communications.
Carrying the discipline of airborne operations, Scott worked in the aerospace sector as a Satellite Engineer and Orbital Analyst. He also held a role in the housing sector, supporting marketing and business development initiatives.
Scott received his law degree from Stetson University College of Law. He attended American Military University, where he earned degrees in marketing, business management, and related support services.
About Ball Janik LLP
Ball Janik LLP is a Florida-based law firm offering construction defect, construction law, insurance recovery, and commercial litigation counsel to its local and national clients. The firm was founded in 1982 and has expanded its capabilities, professionals, and geographic footprint. What started as a small firm focused on real property, land use, and litigation (known then as Ball Janik & Novack) has grown to a team of 50-plus attorneys and paralegals in 5 offices in Florida, with centuries of combined experience and capabilities. The firm has been recognized by Chambers USA, U.S. News & World Report and Best Lawyers®, The Best Lawyers in America©, and Corporate International. Read more here: https://www.balljanik.com.
Contract Interpretation – Determining What the Contract Requires
March 24, 2026 —
David Adelstein - Florida Construction Legal UpdatesA good ole dispute on contract interpretation in government contracting. Contract interpretation disputes happen all the time in every jurisdiction under the sun. Think about that. Now, what’s the best way to avoid a contract interpretation dispute? Naturally, invest in the contract language and fully understand the scope of work. Make all of this clear. But, of course, this isn’t foolproof meaning you could still be doing this and you could still find yourself in a contract interpretation dispute. Although, if you are doing this, and being proactive, the contract interpretation disputes should be minimal and more streamlined.
In Liberty Technical Services, LLC v. Department of Veterans Affairs, CBCA 8385, 2026 WL 407656 (CBCA 2026), the dispute centered on whether the government owed the contractor for certain, necessary equipment (largely controllers, but also tanks and pumps) not specified in the contract. The government countered that this should be a non-issue because the contractor always acknowledged it was responsible for furnishing the unspecified, necessary equipment, and the contractor did actually provide the equipment without direction from the government. Each party claimed the contract was unambiguous when construed in context.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com