The Deadline to File Suit on a Public Works Payment Payment Bond is Triggered by a Claimant’s Work on a Project Not by a Claimant’s Work Under a Contract
June 02, 2026 —
Garret D. Murai - California Construction Law BlogCalifornia law requires that prime contractors furnish a payment bond – providing for payment to lower-tiered subcontractors and suppliers – on state and local public works projects with a value in excess of $25,000. There are three conditions that must be satisfied when a claimant makes a claim against a payment bond on a public works project in California:
- First, generally, the claimant must have served a preliminary notice, unless the claimant is a first-tier subcontractor or supplier;
- The claimant must have “ceased to provide work” on the project; and
- The claimant must file suit against the payment bond no later than six (6) months after the period in which a stop payment notice must be given or, in other words, the earlier of 270 days after completion of the public works project or 210 days after a notice of completion or cessation was recorded on a public works project.
In
Tarlton & Sons, Inc. v. Great American Insurance Company, 111 Cal.App.5th 376 (2025), the 2nd District Court of Appeal examined whether a subcontractor timely filed a claim against a payment bond when a prime contractor was terminated and replaced by another prime contractor who the subcontractor continued to perform work for.
Read the full story...Reprinted courtesy of
Garret D. Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Construction Robotics Works Where Variation Ends
August 11, 2026 —
Aarni Heiskanen - AEC BusinessBuiltWorlds published its
2026 Robotics Top 50 this summer, and the list is genuinely wide. Fifty solutions across nine categories, from 3D printing and prefabricated component manufacturing to earthmoving, demolition, material transport, layout, installation, inspection, and drilling. The honorees come from sixteen countries. It looks like robotics has finally spread across the whole project lifecycle.
However, having vendors in nine categories does not mean that contractors are robotizing their work en masse.
Zacua Ventures, in its
2026 construction robotics report, estimates that on-site robotics accounted for less than 0.03% of global construction spending in 2025. Zacua says: “That is not a failed market. It is a market at the beginning of an adoption S-curve”, while warning that its estimates rest on private vendor data and may be high if vendors overstate how widely their machines are deployed.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Beyond the Storm: How Non-Hurricane Catastrophes Expose Florida’s Construction Defect Blind Spot
August 11, 2026 —
Franchesco “Frank” Soto & Amanda L. Gonzalez - Ball JanikOn June 8, 2026, a magnitude 6.1 earthquake struck the Gulf near the coast of Cuba, the largest instrumentally recorded earthquake in the Gulf since seismic monitoring began in 1950. Buildings swayed, offices were evacuated, and many residents along the east coast of Florida, from Miami-Dade to Jacksonville, felt the ground shake. Although no tsunami followed and reported structural damage was limited, this event exposed a blind spot that Florida property owners, developers, and their counsel cannot afford to ignore: catastrophic stress on Florida buildings does not always come in the form of a named storm.
Florida property owners have grown accustomed to preparing for wind, storm surge, floods, and torrential rain. Far less attention is paid to earthquakes, sinkholes, tornadoes, hail, and non-tropical flooding, each of which can place unexpected stress on buildings not designed with those forces top of mind and can trigger deficiencies in buildings that were not otherwise known, expose design failures, and create an urgency for both insurance claims and subsequent litigation.
Non-Hurricane Triggers of Latent Defects
Seismic activity is the clearest example. Florida’s building code accounts for wind loads, not seismic forces, meaning even a moderate earthquake can reveal weaknesses in curtain wall systems, structural connections, or foundations that were already marginal. Sinkholes, driven by Florida’s karst limestone geology, remain a persistent threat, particularly in Central Florida, where subsurface voids can undermine foundations without warning. Non-tropical flooding, like the record rainfall that flooded South Florida in June 2024, can intrude through building envelopes and waterproofing systems that were never stress-tested for such volumes of water. Tornadoes and hail, while more localized, can cause roofing and envelope failures that mimic, mask, or trigger latent construction defects.
The Litigation and Coverage Disputes That Follow
When one of these events strikes a building already carrying undisclosed or unresolved construction defects, the resulting disputes become considerably more complex. Property owners and associations must move quickly to document existing conditions and distinguish damage caused by the event from pre-existing defective construction, the same causation issue that arises in the hurricane context under Chapter 558, but often without the benefit of established precedent or adjuster experience with these less common events.
Insurance coverage disputes frequently follow close behind. Carriers may dispute whether an earthquake, flood, or other peril is covered at all, particularly where policies contain earthquake or flood exclusions requiring separate endorsements, or anti-concurrent causation language that can bar coverage entirely when a covered peril combines with an uncovered one, such as pre-existing defective construction, to cause a loss. Sinkhole claims carry their own statutory framework under Florida law, requiring specific testing protocols and reporting before a claim is compensable. Developers and contractors, in turn, may find themselves defending Chapter 558 claims while simultaneously litigating with their own carriers over defense and indemnity obligations.
Practical Risk Mitigation Strategies
Property owners, associations, and developers can take several concrete steps to reduce their exposure. First, maintain thorough documentation, including engineering reports, maintenance logs, and photographs, well before any event occurs. This documentation is often the deciding factor in causation disputes. Second, engage structural engineers and consultants immediately following any seismic event, unusual flooding, or storm damage, regardless of whether a hurricane is involved. Prompt inspection preserves evidence and can help prevent inadvertent waiver of construction defect claims. Third, review insurance policies regularly with counsel or a broker to confirm earthquake, flood, and sinkhole coverage matches the property’s actual risk profile, rather than assuming a standard property policy responds to every peril. Fourth, avoid rushing to remediate before conditions are documented and/or before consulting counsel. Well-intentioned repairs can inadvertently compromise evidence needed to prove a defect claim.
The June earthquake was a reminder that Florida’s catastrophic risk profile extends beyond hurricane season. Property owners, associations, and developers who build readiness plans around all forms of catastrophic stress, not just named storms, will be far better positioned when the next unexpected event occurs.
Franchesco “Frank” Soto is a partner in
Ball Janik’s Construction Defect Practice Group in Miami. He may be reached at fsoto@balljanik.com.
Amanda L. Gonzalez is a litigation attorney in
Ball Janik’s Construction Defect Practice Group in Miami. She may be reached at agonzalez@balljanik.com.
Contractor Dispute Resolution Framework and Prevention
July 06, 2026 —
Construction ExecutiveWHAT DEFINES A CONTRACTOR DISPUTE RESOLUTION FRAMEWORK
A contractor dispute resolution framework is a structured system of contractual terms, governance processes and escalation pathways designed to prevent, manage and resolve conflicts between contracting parties with minimal disruption to cost, schedule and performance.
The framework operates as both a preventive control and a corrective mechanism. Preventive elements establish clarity in scope, expectations and accountability before work begins. Corrective elements define how disagreements are identified, documented, escalated and resolved once they arise.
Reprinted courtesy of
Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...
21 Snell & Wilmer Attorneys Named Lawyers of the Year by Best Lawyers® for 2027
October 12, 2026 —
Snell & WilmerPHOENIX – Snell & Wilmer is pleased to announce that 21 of the firm’s attorneys, located across eight offices, have been named 2027 Lawyers of the Year by Best Lawyers®.
In conjunction with selection to the 2027 edition of The Best Lawyers in America® guide, the “Lawyer of the Year” recognition is awarded to individual lawyers with the highest overall peer-feedback for a specific practice area and geographic region. Only one lawyer is recognized for each practice area and location.
Read the full story...Reprinted courtesy of
Snell & Wilmer
The Firm Turns 16!
July 20, 2026 —
Christopher G. Hill - Construction Law MusingsI have always found it appropriate that my jump to solo practice and Independence Day are so close in time. Today marks the 16th anniversary of
my first day as a solo practitioner of construction law at
The Law Office of Christopher G. Hill, PC. Time sure has flown by thanks to the great clients and friends who followed me to solo practice and whom I have met since the firm’s founding on July 1, 2010. I also could not have made the transition and had the fun and success I have enjoyed over the past 16 years without the support of the best wife and family that any construction lawyer could want.
Since the firm’s last anniversary, my youngest child (who was 7 when this journey began!) has graduated from N. C. State University with a fisheries and wildlife biology degree and is currently in Casper, Wyoming working for
Wyoming Game & Fish, my second oldest is an assistant director of admissions at
Appalachian State University in Boone, NC, and has celebrated his second wedding anniversary, and my oldest has celebrated her fifth marriage anniversary. Our home in Captiva, Florida continues its recovery from from Hurricane Ian and subsequent hurricanes.
Read the full story...Reprinted courtesy of
The Law Office of Christopher G. Hill
Cuomo Bridge Lawsuit Adversaries Weigh Mediated Settlement
July 06, 2026 —
Richard Korman - Engineering News-RecordRival legal teams have reached a critical juncture as they consider a mediated settlement in one of two major payment lawsuits pending between a design-build contracting team and the New York State Thruway Authority over construction of the more than $3-billion Mario M. Cuomo Bridge north of New York City.
Read the full story...Reprinted courtesy of
Richard Korman, Engineering News-RecordMr. Korman may be contacted at
kormanr@enr.com
Over 50 Lewis Brisbois Attorneys Recognized in 7th Edition of Best Lawyers: Ones to Watch in America
September 01, 2026 —
Lewis Brisbois56 Lewis Brisbois attorneys across 26 offices have been named to the 7th edition of “Best Lawyers: Ones to Watch in America.” Congratulations to the following attorneys on this recognition!
You can see the full list of Lewis Brisbois attorneys named to Best Lawyers' 33rd edition of The Best Lawyers in America
here.
Akron, OH
- Partner Meleah M. Skillern - Commercial Litigation
Atlanta, GA
- Partner Catherine Crawley - Personal Injury Litigation – Defendants; and Transportation Law
- Associate Davis Lackey - Insurance Law; and Personal Injury Litigation – Defendants
Read the full story...Reprinted courtesy of
Lewis Brisbois