BERT HOWE
  • Nationwide: (800) 482-1822    
    multi family housing expert witness Bottineau North Dakota office building expert witness Bottineau North Dakota low-income housing expert witness Bottineau North Dakota high-rise construction expert witness Bottineau North Dakota custom homes expert witness Bottineau North Dakota parking structure expert witness Bottineau North Dakota condominiums expert witness Bottineau North Dakota industrial building expert witness Bottineau North Dakota tract home expert witness Bottineau North Dakota Medical building expert witness Bottineau North Dakota custom home expert witness Bottineau North Dakota housing expert witness Bottineau North Dakota concrete tilt-up expert witness Bottineau North Dakota mid-rise construction expert witness Bottineau North Dakota casino resort expert witness Bottineau North Dakota landscaping construction expert witness Bottineau North Dakota hospital construction expert witness Bottineau North Dakota institutional building expert witness Bottineau North Dakota Subterranean parking expert witness Bottineau North Dakota townhome construction expert witness Bottineau North Dakota structural steel construction expert witness Bottineau North Dakota production housing expert witness Bottineau North Dakota
    Bottineau North Dakota multi family design expert witnessBottineau North Dakota expert witness windowsBottineau North Dakota consulting engineersBottineau North Dakota reconstruction expert witnessBottineau North Dakota construction project management expert witnessBottineau North Dakota fenestration expert witnessBottineau North Dakota construction scheduling expert witness
    Arrange No Cost Consultation
    Construction Expert Witness Builders Information
    Bottineau, North Dakota

    North Dakota Builders Right To Repair Current Law Summary:

    Current Law Summary: (HB1437) Notice required six months prior to undertaking any repair other than emergency repair, or instituting action for breach of warranty of one or two-family dwelling; response time 30 days.


    Construction Expert Witness Contractors Licensing
    Guidelines Bottineau North Dakota

    A contractor's license is required for all jobs over $2,000.00. Separate boards license plumbing and electrical trades.


    Construction Expert Witness Contractors Building Industry
    Association Directory
    Minot Association of Bldrs
    Local # 3565
    PO Box 1851
    Minot, ND 58702

    Bottineau North Dakota Construction Expert Witness 10/ 10

    Williston Area Builders Association
    Local # 3520
    PO Box 1825
    Williston, ND 58802
    Bottineau North Dakota Construction Expert Witness 10/ 10

    Forx Builders Association
    Local # 3515
    519 DeMers Ave
    Grand Forks, ND 58201

    Bottineau North Dakota Construction Expert Witness 10/ 10

    North Dakota AB
    Local # 3500
    1720 Burnt Boat Dr Ste 207
    Bismarck, ND 58503

    Bottineau North Dakota Construction Expert Witness 10/ 10

    Bismarck-Mandan Home Builders Association
    Local # 3510
    2600 Gateway Ave Ste 1
    Bismarck, ND 58503

    Bottineau North Dakota Construction Expert Witness 10/ 10

    Dickinson Area Home Builders Association
    Local # 3512
    PO Box 1697
    Dickinson, ND 58602
    Bottineau North Dakota Construction Expert Witness 10/ 10

    Home Builders Association of Fargo-Moorhead
    Local # 3545
    1802 32nd Ave S
    Fargo, ND 58103

    Bottineau North Dakota Construction Expert Witness 10/ 10


    Construction Expert Witness News and Information
    For Bottineau North Dakota


    Mass-Timber Furnished Apartments Fare Well in Fire Tests

    Newmeyer Dillion Announces Jacqueline McCalla as Its Newest Partner

    Judgment Proof: Reducing Litigation Exposure with Litigation Risk Insurance

    Chambers USA 2019 Ranks White and Williams as a Leading Law Firm

    Mississippi Sues Over Public Health Lab Defects

    Tax Increase Pumps $52 Billion Into California Construction

    A Court-Side Seat: A FACA Fight, a Carbon Pledge and Some Venue on the SCOTUS Menu

    Lay Testimony Sufficient to Prove Diminution in Value

    Three Firm Members Are Top 100 Super Lawyers & Ten Are Recognized As Super Lawyers Or Rising Stars In 2018

    Fixed Price, Fluid Quantities: The Hidden Risks in Lump Sum Agreements with Variable Units

    Another Guilty Plea in Las Vegas HOA Scandal

    Colorado “occurrence”

    President Trump Announces New Steel Tariffs

    Newmeyer & Dillion Announces New Partner Bahaar Cadambi

    Architectural Democracy – Interview with Pedro Aibéo

    Federal Court Ruling Bolsters the “Your Work” Exclusion in Standard CGL Policies

    The Impact of the IIJA and Amended Buy American Act on the Construction Industry

    What Makes a Great Lawyer?

    Cross-Office Team Secures Summary Judgment Win in Negligence Action with $2M Demand

    The Burden of Betterment

    Mid-Session Overview of Colorado’s 2017 Construction Defect Legislation

    CA Supreme Court Finds “Consent-to-Assignment” Clauses Unenforceable After Loss Occurs During the Policy Period

    Natural Hydrogen May Seem New in Town, but It’s Been Here All Along

    Supreme Court Eliminates Judicial 'Chevron' Deference to Federal Agency Statutory Interpretations

    Court Holds That Property Insurance Does Not Cover Economic Loss From Purchasing Counterfeit Vintage Wine

    Reminder: Pay if Paid Not All Encompassing (but Could it be?)

    Landmark Montana Supreme Court Decision Series: The Duty to Defend

    Concerns About On-the-job Safety Persist

    Colorado House Bill 20-1290 – Restriction on the Use of Failure to Cooperate Defense in First-Party Claims

    9 Basic Strategies for Pursuing Coverage for Construction Accident Claims

    Panthers Withdraw City, County Deal Over Abandoned Facility

    Finding Highway Compromise ‘Tough,’ DOT Secretary Says

    Kiewit and Two Ex-Managers Face Canada Jobsite Fatality Criminal Trial

    Third Circuit Holds That Duty to Indemnify "Follows" Duty to Defend

    Court Upholds Appraisers' Use of "Increased Cost of Construction" Provision

    Just When You Thought the Green Building Risk Discussion Was Over. . .

    Guessing as to your Construction Damages is Not the Best Approach

    Hurricane Milton Barrels Toward Florida With 180 MPH Winds

    Number of Occurrences Is On the Agenda at This Year's ICLC Seminar

    Arizona Purchaser Dwelling Actions Are Subject to a New Construction

    Texas Supreme Court Finds Payment of Appraisal Award Does Not Absolve Insurer of Statutory Liability

    Older Homes for Sale in California Now Come With Wildfire Warnings

    California Supreme Court Declines Request to Expand Exceptions to Privette Doctrine for Known Hazards

    Standing When It Comes to Real Property Owned by a Trust

    To Bee or Not to Bee - CA Court Finds Denial of Coverage Based on Exclusion was Premature Where Facts had not been Judicially Determined

    California Supreme Court Finds Negligent Supervision Claim Alleges An Occurrence

    De-escalating The Impact of Price Escalation

    BHA at The Basic Course in Texas Construction Law

    Safeguarding History: Fire Risks in Renovating Historic Buildings

    The Washington Supreme Court Rules that a Holder of a Certificate of Insurance Is Entitled to Coverage
    Corporate Profile

    BOTTINEAU NORTH DAKOTA CONSTRUCTION EXPERT WITNESS
    DIRECTORY AND CAPABILITIES

    Leveraging from more than 7,000 construction defect and claims related expert witness designations, the Bottineau, North Dakota Construction Expert Witness Group provides a wide range of trial support and consulting services to Bottineau's most acknowledged construction practice groups, CGL carriers, builders, owners, and public agencies. Drawing from a diverse pool of construction and design professionals, BHA is able to simultaneously analyze complex claims from the perspective of design, engineering, cost, or standard of care.

    Construction Expert Witness News & Info
    Bottineau, North Dakota

    Wisconsin Supreme Court Finds Coverage Under Ensuing Loss Provisions

    September 29, 2026 —
    Reversing the trial court’s grant of summary judgment to the insurer, the Wisconsin Supreme Court determined that genuine issues of material fact existed on whether ensuing losses as defined in the policy were covered. Cincinnati Ins. Co. v. Ropicky, 2026 Wisc. LEXIS 302 (Wis. July 7, 2026). The insured suffered damage during a storm on May 11, 2018, when rainwater poured into the home. The insureds gave notice to their insurer, Cincinnati. Upon inspection, Cincinnati determined that water intrusion resulted from multiple construction defects in the home. In the front of the home, water entered through a gap in the stone veneer. The inspector also concluded that the damage from rainwater was not just from the May 11, 2018, storm, but damage had occurred from prior storm events. Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    Fight for Your Right: Effects of FAR Final Rule on Construction

    October 12, 2026 —
    Since the Federal Acquisition Regulation final rule Use of Project Labor Agreements for Federal Construction Projects took effect, contractors seeking to compete for federal projects of $35 million or more must “negotiate or become a party to a project labor agreement with one or more labor organizations.” While this requirement significantly reduces competition for covered procurements, contractors may seek to restore competition on individual solicitations by filing a bid protest with the U.S. Court of Federal Claims. Bid protests through the COFC become possible once a federal agency posts a solicitation that includes contract provisions mandating a PLA. (In some cases, a presolicitation notice that a PLA mandate will be applied may be sufficient.) Reprinted courtesy of Michael Altman, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...
    Mr. Altman may be contacted at altman@abc.org

    Sausage-Making Often Relies on the Good Sense of the Chef Rather than the Recipe

    June 23, 2026 —
    Even for lawyers, the rules governing litigation can get complex and convoluted. Does something need to be filed? What needs to be filed? When is the deadline for filing? Simple questions with not always with straightforward answers. This was the case in R & J Sheet Metal, Inc. v. W.E. O’Neil Construction Co. of California, 111 Cal.App.5th 878 (2025), which involved sheet metal panels lost when they fell into the Port of Long Beach harbor. Read the full story...
    Reprinted courtesy of Garret D. Murai, Nomos LLP
    Mr. Murai may be contacted at gmurai@nomosllp.com

    FERC Issues Show-Cause Orders: Impacts on California and Other Regional Power Markets

    July 13, 2026 —
    At an open meeting on June 18, 2026, the Federal Energy Regulatory Commission (FERC) issued show-cause orders under Section 206 of the Federal Power Act to the six FERC-jurisdictional RTOs/ISOs—PJM Interconnection, ISO New England, Midcontinent Independent System Operator, Southwest Power Pool, New York Independent System Operator and California Independent System Operator—along with their transmission owners (TOs), directing each region and the TOs to justify or revise tariff provisions governing how data centers and other large loads connect to and receive transmission service from the grid. These show-cause orders will impact several power markets across the country, including California. Reprinted courtesy of Stephen J. Humes, Pillsbury, Alicia M. McKnight, Pillsbury and Jason Drogin Atwood, Pillsbury Mr. Humes may be contacted at stephen.humes@pillsburylaw.com Ms. McKnight may be contacted at alicia.mcknight@pillsburylaw.com Mr. Atwood may be contacted at jason.atwood@pillsburylaw.com Read the full story...

    From CERCLA to Drinking Water: D.C. Circuit’s PFAS Ruling Enters a Second Regulatory Fight

    October 06, 2026 —
    On August 18, 2026, a unanimous panel of the U.S. Court of Appeals for the D.C. Circuit upheld EPA’s designation of perfluorooctanoic acid (PFOA) and perfluorooctanesulfonic acid (PFOS) as hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA or Superfund). In Chamber of Commerce of the United States v. EPA, the court rejected challenges to EPA’s interpretation of CERCLA Section 102(a), the adequacy of its notice and comment process, its analysis of costs and benefits, and its decision to proceed despite uncertainty about future response actions and costs. This decision is already being invoked in a separate D.C. Circuit challenge to EPA’s 2024 PFAS drinking water rule promulgated under the Safe Drinking Water Act (SDWA). Six days after the CERCLA decision, respondent intervenors cited it as supplemental authority in American Water Works Association v. EPA, No. 24-1188, ahead of oral argument scheduled for September 18, 2026. The Chamber of Commerce decision may assist the respondent intervenors on certain notice and comment and economic analysis arguments, but its significance should not be overstated. The principal challenges to the standards for the four PFAS subject to EPA’s Hazard Index-based maximum contaminant level (MCL) turn on requirements specific to the SDWA, and EPA itself now agrees that those provisions were promulgated through an unlawful process. Reprinted courtesy of Ashleigh K. Myers, Pillsbury, Amanda G. Halter, Pillsbury and Jillian Marullo, Pillsbury Ms. Myers may be contacted at ashleigh.myers@pillsburylaw.com Ms. Halter may be contacted at amanda.halter@pillsburylaw.com Ms. Marullo may be contacted at jillian.marullo@pillsburylaw.com Read the full story...

    The ROI of Estimating Accuracy in Preconstruction

    September 15, 2026 —
    Precision is the foundation of profitability in construction. Even minor quantity or pricing mistakes can swing bids anywhere from 5-15%, leading to project delays, unprofitable jobs or margin erosion through change orders. And worse, these losses can damage client trust and jeopardize long-term relationships that drive repeat business and future bids. Consistently estimating accurately builds confidence, speeds up bidding and positions your company to win more profitable projects. Estimating accuracy is where profit is either protected or lost. In construction, you make your biggest financial decisions before a project ever starts. Once a bid is won, most of the project’s cost structure is locked in. If the estimate is wrong, no amount of execution can fully fix those mistakes. That makes estimating accuracy a business issue, not just an operations issue. Reprinted courtesy of Aaron Kivett, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the full story...

    Saxe Doernberger & Vita, P.C. Expands with New Office in Foxborough, Massachusetts

    June 08, 2026 —
    Foxborough, MA — April 1st, 2026— Saxe Doernberger & Vita, P.C. (SDV), a national law firm focused exclusively on representing policyholders in insurance coverage disputes, is pleased to announce the opening of its new office in Foxborough, Massachusetts. The expansion marks another milestone in the firm’s continued growth and deepens SDV’s ability to serve clients across the region. The new location strengthens SDV’s presence in Massachusetts and expands the firm’s capacity to support both existing and anticipated client needs in an increasingly complex insurance landscape. Read the full story...
    Reprinted courtesy of Saxe Doernberger & Vita, P.C.

    Construction Liens: Liening for Amounts Not Yet Technically Due Does Not Mean Lien Is Fraudulent

    August 11, 2026 —
    A 2024 bankruptcy ruling, In re Edgewater Construction Group, Inc., 657 B.R. 668 (S.D.Fla. 2024), touched upon an interesting issue when it comes to construction liens. Is a construction lien fraudulent simply because the lien includes amounts not yet due? Not necessarily. In this bankruptcy dispute, the subcontractor debtor (that filed for bankruptcy) recorded two construction liens on projects. The general contractor argued in the bankruptcy court that the subcontractor debtor’s liens were fraudulent. As to the first lien, the general contractor argued that the lien was fraudulent because it included amounts that the debtor knew the general contractor had already paid to the debtor’s subcontractors/suppliers. The bankruptcy court disagreed: “The Court finds that, although the Debtor had been told that [the general contractor] had paid these subcontractors, in light of the ongoing dispute between Debtor and [the general contractor], it was reasonable for the Debtor to demand proof. Debtor’s subsequent filing of a partial satisfaction of lien once the Debtor received the requested proof of payment from [the general contractor] counters any claim of willful exaggeration.” In re Edgewater Construction Group, supra, at 672-673. Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris
    Mr. Adelstein may be contacted at dma@kirwinnorris.com