Prefatory Contract Language Cannot Be Used to Create an Ambiguity with Operative Provisions
May 12, 2026 —
David Adelstein - Florida Construction Legal UpdatesContract drafting and interpretation matters.
A case dealt with the potential conflict with prefatory language in an agreement compared with operative provisions in the agreement. The trial court held that the operative provisions control. I discussed this case
here where the appellate court reversed based on the prefatory language.
But, through a motion for rehearing, the appellate court reconsidered its position and affirmed the trial court based on the operative provisions, mainly that the prefatory language cannot be used to create an ambiguity with operative provisions. Consider this explanation in affirming the trial court:
Because the trial court correctly found that the initial language in the contract was prefatory and could not be used to create an ambiguity in the remainder of the contract, we affirm the final judgment.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Anti-Concurrent Causation Clause Prevents Coverage for Collapse
April 27, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe appellate court affirmed the decision of the trial court granting summary judgment to the insurer after agreeing that the policy’s anti-concurrent causation clause barred coverage. Lido Hospitality, Inc. v. AIX Specialty Ins. Co., 2026 Iii. App. Unpub. LEXIS 133 (Ill. Ct. App. Jan. 27, 2026).
One of the brick veneer walls of the Lido Motel collapsed during a windstorm. Lido reported the loss it its insurer, AIX. AIX investigated and determined that the brick veneer collapsed due to pervasive wear and tear and corrosion of the underlying infrastructure that secured the veneer- specifically the components that anchored or tied the masonry veneer to the underlying wooden substrate.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Wilke Fleury Attorneys Recognized by 2026 Northern California Super Lawyers and Rising Stars!
July 20, 2026 —
Wilke FleuryWilke Fleury is pleased to announce that 18 of the firm’s attorneys have been selected for inclusion on the 2026 Northern California Super Lawyers and Rising Stars lists.
The annual Super Lawyers and Rising Stars selections recognize attorneys across a wide range of practice areas. This year’s honorees reflect the depth of Wilke Fleury’s litigation, business, healthcare, employment, bankruptcy, appellate, real estate, construction, and estate planning practices.
Read the full story...Reprinted courtesy of
Wilke Fleury
Chambers USA Recognizes Hunton’s Insurance Coverage Practice in 2026 Guide
June 29, 2026 —
Hunton Insurance Recovery BlogHunton is pleased to announce that its insurance coverage practice was recognized nationally for Insurance: Dispute Resolution – Policyholder in the recently released 2026 Chambers USA guide. The team also received state rankings in Florida (Insurance: Dispute Resolution), Georgia (Insurance), the District of Columbia (Insurance: Policyholder), and Massachusetts (Insurance).
In addition to the insurance team’s group recognition across multiple states, the 2026 guide included individual rankings for
Lorelie “Lorie” S. Masters (USA Nationwide and District of Columbia),
Latosha M. Ellis (District of Columbia),
Michael S. Levine (District of Columbia),
Koorosh “KT” Talieh (District of Columbia),
Walter J. Andrews (Florida),
Andrea DeField (Florida),
Cary D. Steklof (Florida),
Lawrence J. Bracken II (Georgia), and
Geoffrey B. Fehling (Massachusetts).
Read the full story...Reprinted courtesy of
Hunton Andrews Kurth LLP
PSA: Be Sure to Document (Even When Time is Short)
April 14, 2026 —
Christopher G. Hill - Construction Law MusingsWritten
change orders are a big deal. Almost all construction contracts (at least
the well drafted ones) require written contracts. Written change orders are even important enough that Virginia law
requires these provisions in residential construction contracts.
Why are they so important? Because they are a “mini-contract” of sorts. They
set the expectations, price, time, and work to be performed; work that was not included in the original price or scope for the project. Without this in writing, there will be no record of what the parties agreed to do. Does this sound familiar? Sound like its own contract? It should.
Read the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Beyond the Storm: How Non-Hurricane Catastrophes Expose Florida’s Construction Defect Blind Spot
August 11, 2026 —
Franchesco “Frank” Soto & Amanda L. Gonzalez - Ball JanikOn June 8, 2026, a magnitude 6.1 earthquake struck the Gulf near the coast of Cuba, the largest instrumentally recorded earthquake in the Gulf since seismic monitoring began in 1950. Buildings swayed, offices were evacuated, and many residents along the east coast of Florida, from Miami-Dade to Jacksonville, felt the ground shake. Although no tsunami followed and reported structural damage was limited, this event exposed a blind spot that Florida property owners, developers, and their counsel cannot afford to ignore: catastrophic stress on Florida buildings does not always come in the form of a named storm.
Florida property owners have grown accustomed to preparing for wind, storm surge, floods, and torrential rain. Far less attention is paid to earthquakes, sinkholes, tornadoes, hail, and non-tropical flooding, each of which can place unexpected stress on buildings not designed with those forces top of mind and can trigger deficiencies in buildings that were not otherwise known, expose design failures, and create an urgency for both insurance claims and subsequent litigation.
Non-Hurricane Triggers of Latent Defects
Seismic activity is the clearest example. Florida’s building code accounts for wind loads, not seismic forces, meaning even a moderate earthquake can reveal weaknesses in curtain wall systems, structural connections, or foundations that were already marginal. Sinkholes, driven by Florida’s karst limestone geology, remain a persistent threat, particularly in Central Florida, where subsurface voids can undermine foundations without warning. Non-tropical flooding, like the record rainfall that flooded South Florida in June 2024, can intrude through building envelopes and waterproofing systems that were never stress-tested for such volumes of water. Tornadoes and hail, while more localized, can cause roofing and envelope failures that mimic, mask, or trigger latent construction defects.
The Litigation and Coverage Disputes That Follow
When one of these events strikes a building already carrying undisclosed or unresolved construction defects, the resulting disputes become considerably more complex. Property owners and associations must move quickly to document existing conditions and distinguish damage caused by the event from pre-existing defective construction, the same causation issue that arises in the hurricane context under Chapter 558, but often without the benefit of established precedent or adjuster experience with these less common events.
Insurance coverage disputes frequently follow close behind. Carriers may dispute whether an earthquake, flood, or other peril is covered at all, particularly where policies contain earthquake or flood exclusions requiring separate endorsements, or anti-concurrent causation language that can bar coverage entirely when a covered peril combines with an uncovered one, such as pre-existing defective construction, to cause a loss. Sinkhole claims carry their own statutory framework under Florida law, requiring specific testing protocols and reporting before a claim is compensable. Developers and contractors, in turn, may find themselves defending Chapter 558 claims while simultaneously litigating with their own carriers over defense and indemnity obligations.
Practical Risk Mitigation Strategies
Property owners, associations, and developers can take several concrete steps to reduce their exposure. First, maintain thorough documentation, including engineering reports, maintenance logs, and photographs, well before any event occurs. This documentation is often the deciding factor in causation disputes. Second, engage structural engineers and consultants immediately following any seismic event, unusual flooding, or storm damage, regardless of whether a hurricane is involved. Prompt inspection preserves evidence and can help prevent inadvertent waiver of construction defect claims. Third, review insurance policies regularly with counsel or a broker to confirm earthquake, flood, and sinkhole coverage matches the property’s actual risk profile, rather than assuming a standard property policy responds to every peril. Fourth, avoid rushing to remediate before conditions are documented and/or before consulting counsel. Well-intentioned repairs can inadvertently compromise evidence needed to prove a defect claim.
The June earthquake was a reminder that Florida’s catastrophic risk profile extends beyond hurricane season. Property owners, associations, and developers who build readiness plans around all forms of catastrophic stress, not just named storms, will be far better positioned when the next unexpected event occurs.
Franchesco “Frank” Soto is a partner in
Ball Janik’s Construction Defect Practice Group in Miami. He may be reached at fsoto@balljanik.com.
Amanda L. Gonzalez is a litigation attorney in
Ball Janik’s Construction Defect Practice Group in Miami. She may be reached at agonzalez@balljanik.com.
Celebrating Freedom: The Overlooked Freedom to Contract in Commercial Insurance
July 20, 2026 —
Michael S. Levine & Andrea DeField - Hunton Insurance Recovery BlogHappy 4th and 250 years of freedom . . . to contract!
Many policyholders assume insurance policies are “standard” and must be accepted as-is. That assumption is often wrong—and dangerously limiting. Unlike many consumer insurance markets, the commercial insurance realm preserves a robust “freedom to contract,” allowing sophisticated policyholders to negotiate terms, exclusions, definitions, and limits before a policy is even issued. Particularly in recent years, high-profile disputes over cyber coverage, business interruption, and war/cyber exclusions have shown not just what happens when coverage is denied, but what could have been done up front to avoid those fights.
This post highlights the power policyholders still hold in the negotiation process and illustrates, with concrete examples from recent media-covered disputes, how that freedom can be strategically used.
Reprinted courtesy of
Michael S. Levine, Hunton Andrews Kurth LLP and
Andrea DeField, Hunton Andrews Kurth LLP
Mr. Levine may be contacted at mlevine@hunton.com
Ms. DeField may be contacted at adefield@hunton.com
Read the full story...
$27B Meta Data Center Pushes Louisiana Toward Massive Power Expansion
April 27, 2026 —
Vince Kong - Engineering News-RecordMeta Platforms has reached an agreement with Entergy Louisiana to fund new energy infrastructure to support its planned $27-billion data center in Richland Parish, a project the company says could ultimately scale to 5 GW, becoming its largest facility to date. CEO Mark Zuckerberg has described the site as large enough to cover a significant portion of Manhattan.
Read the full story...Reprinted courtesy of
Vince Kong, Engineering News-RecordMr. Kong may be contacted at
kongv@enr.com