Ahlers Cressman & Sleight Is Pleased to Announce Our Recognition in the 2027 Edition of Best Law Firms®
November 09, 2026 —
Ahlers Cressman & Sleight PLLCAhlers Cressman & Sleight is pleased to announce our recognition in the 2027 edition of Best Law Firms®, ranked by Best Lawyers. ACS received a Tier 1 ranking in Seattle for both Construction Law and Construction Litigation; and a Tier 2 national ranking in the same areas.
Best Law Firms® rankings are assessed through analyzing feedback provided by clients and professional references, information supplied by the firm, industry leader interviews, and lawyer evaluations collected through the Best Lawyers research process. For the 2027 edition, more than 110,000 client references were submitted as part of the Best Law Firms research process.
Read the full story...Reprinted courtesy of
Ahlers Cressman & Sleight PLLC
Kahana Feld Obtains Favorable Result in High-Exposure NY Premises Liability Case
June 15, 2026 —
Leigh Katz - Kahana FeldKahana Feld partner Leigh Katz obtained a significant victory in a recent matter involving a videotaped alleged trip and fall on the sidewalk in front of the client’s commercial residence. The plaintiff claimed he suffered a knee injury that necessitated surgery, along with other assorted injuries that prevented him from continuing high-level athletic activities. Leigh was able to demonstrate that the fall was staged and received a voluntary discontinuance with prejudice.
At mediation, Leigh emphasized that KF’s expert witness challenged the plaintiff’s claim that the fall was caused by a sidewalk height differential after reviewing the videotape footage and determining the plaintiff’s fall began before his feet made contact with the alleged defect. Based on this analysis, the expert concluded the reported height differential did not initiate the fall, which supported KF’s position that the incident depicted in the video was unrealistic and appeared staged.
Read the full story...Reprinted courtesy of
Leigh Katz, Kahana FeldMs. Katz may be contacted at
lkatz@kahanafeld.com
Late Notice Bars Insured’s Claim for Water Leak Damage
August 11, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe federal district court granted the insurer’s motion for summary judgment dismissing the insured’s claim due to late notice. Global Approach, Inc. v. Scottsdale Ins. Co., 2026 U.S. Dist. LEXIS 120183 (S. D. Fla. June 1, 2026).
Global suffered water damage on September 3, 2021, which originated in the bathroom of one of its rental properties. Global reported the claim to its insurer, Scottsdale, on October 19, 2021. Prior to reporting the claim, Global hired a handyman to inspect the property and then demolished the damaged area and repaired the bathroom.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Arizona Supreme Court Clarifies Parties’ Post-Default Conduct Cannot Validate Void Default Orders
August 24, 2026 —
Joseph Kanefield, Ryan P. Hogan & Lilly M. Geiler - Snell & WilmerAfter filing a lawsuit, the first step is always serving process on the opposing party. While that preliminary step sounds basic enough, in McMahan v. Grasshopper, the Arizona Supreme Court recently provided a helpful refresher on the nuances of the service requirement and its importance in litigation for plaintiffs and defendants alike.1
Background
McMahan arose from a hit-and-run where a tractor-trailer collided with safety barricades and injured a construction worker. The construction worker sued the tractor-trailer company, and he attempted to serve the company by leaving a copy of the complaint with the assistant to the company’s statutory agent who forwarded the complaint to the company. The assistant, however, was not authorized to accept service on the company’s behalf. Before the company appeared in the action, the construction worker successfully obtained an entry of default.
Reprinted courtesy of
Joseph Kanefield, Snell & Wilmer,
Ryan P. Hogan, Snell & Wilmer and
Lilly M. Geiler, Snell & Wilmer
Mr. Kanefield may be contacted at jkanefield@swlaw.com
Mr. Hogan may be contacted at rhogan@swlaw.com
Ms. Geiler may be contacted at lgeiler@swlaw.com
Read the full story...
Pulling the Plug, Preserving the Product: Protecting Rights to a Modular Subcontractor’s Work Post-Termination
June 08, 2026 —
Paul Williamson - ConsensusDocsVolumetric Modular Construction (VMC) is a building method where a structure is divided into large components or modules, fabricated in an offsite factory and then transported to a construction site for assembly.[
1] Proponents of VMC hail it as a cost-efficient alternative to traditional building methods that leads to more consistent quality and shorter construction duration.[
2] Due to a growing labor shortage, high demand for compressed project schedules, and stagnant construction productivity rates, the construction industry is embracing VMC.[
3] A recent report on the market size of prefabricated construction estimates that from 2026 to 2031, VMC will grow at a compound annual growth rate of 7.16% and become a 413.11-billion-dollar industry.[
4]
As VMC becomes more prevalent, owners, general contractors, and subcontractors must consider how to effectively contract for modular construction. One important consideration, which this article focuses on, is navigating termination of a modular subcontractor.
Read the full story...Reprinted courtesy of
Paul Williamson, Peckar & Abramson, P.C.Mr. Williamson may be contacted at
pwilliamson@pecklaw.com
Insured is Third Party Beneficiary of Forced-Place Policy
October 26, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe court denied the insurer’s motion to dismiss the insured’s fire damage claims under a forced-place policy because the insured was a third-party beneficiary of the policy. Fredericks v. Assurant Specialty, et al., 2026 U.S. Dist. LEXIS 179779 (E.D. Pa. Aug. 12, 2026).
The insureds’ home burned down on the same day their homeowner’s policy expired. The expiration automatically triggered a forced-placed policy issued by American Security Insurance Company (ASIC) to the insureds’ mortgage company, Rocket Mortgage Company, LLC.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
White and Williams LLP Secures $42.4 Million Award for Ventana DBS LLC in Philadelphia Marriott Construction Litigation
July 27, 2026 —
Craig O'Neill, Lindsay Liebman, Kristen Nichols Wright, Zachary Roth & William Taylor - White and WilliamsWhite and Williams LLP's Construction and Surety Practice attorneys secured a significant victory for client Ventana DBS LLC in a complex commercial construction dispute before the Philadelphia Court of Common Pleas, Commerce Division. The trial team, led by Bill Taylor, retired Partner, and Craig O'Neill, Co-Chair of the Construction and Surety Practice Group, with support from Lindsay Liebman, Counsel, Zachary Roth, Partner, Kristen Nichols Wright, Associate, and Sue Ferrante, Legal Secretary, obtained a $42.4 million award on Ventana's claims for unpaid work, delay costs, CASPA penalties and interest, attorneys’ fees and other project-related costs arising from the construction of the Marriott W/Element Hotel Project in Philadelphia.
To achieve this result, the White and Williams team managed an extensive discovery period over the course of four-years of litigation, conducted over sixty depositions, participated in court-ordered mediation and arbitration proceedings, and successfully represented Ventana during a bifurcated trial that spanned over the course of a year.
Reprinted courtesy of
Craig O'Neill, White and Williams,
Lindsay Liebman, White and Williams,
Kristen Nichols Wright, White and Williams,
Zachary Roth, White and Williams and
William Taylor, White and Williams
Mr. O'Neill may be contacted at oneillc@whiteandwilliams.com
Ms. Liebman may be contacted at liebmanl@whiteandwilliams.com
Ms. Wright may be contacted at wrightk@whiteandwilliams.com
Mr. Roth may be contacted at rothz@whiteandwilliams.com
Mr. Taylor may be contacted at taylorw@whiteandwilliams.com
Read the full story...
Modular Construction’s Hidden Risk: Where Things Go Wrong Between the Factory and the Field
June 15, 2026 —
Jack Mayo - ConsensusDocsIntroduction
As modular and prefabricated construction methods are increasingly adopted, so too are the potential challenges that come with them. The appeal is straightforward: faster timelines, controlled fabrication environments, and reduced on-site labor demands. But the risks that accompany these benefits are often less clear—and, in many cases, poorly defined.
For example, what happens when a prefabricated component is delayed past its installation window? Who is responsible for a defect discovered inside a sealed, installed module? What happens to warranty obligations when a prefabricated component must be modified on site?
Read the full story...Reprinted courtesy of
Jack Mayo, Jones Walker LLPMr. Mayo may be contacted at
jmayo@joneswalker.com