The GKN Aerospace Chemical Release and the Laws Designed to Address It
July 06, 2026 —
Sean M. Sherlock - Snell & WilmerOn May 21, 2026, a 34,000-gallon storage tank at the GKN Aerospace facility in Garden Grove, California began leaking methyl methacrylate (MMA), a volatile and highly flammable industrial chemical used to manufacture high-strength acrylic plastics. GKN Aerospace makes advanced military and commercial transparencies, such as aircraft canopies, windshields, cabin windows, bullet-resistant glass, and spacecraft windows.
In polymer chemistry lingo, MMA is known as a monomer. Monomers are like individual links to a chain. Under the right conditions they link up (react) with each other to form long-chained polymers, or plastics. MMA is an unstable monomer that requires controlled storage conditions to avoid setting off a polymerization (chain) reaction.
According to early reports, the MMA tank at GKN Aerospace overheated. The cause of the overheating is not yet clear, but the overheating may have created conditions enabling the MMA to initiate polymerization, which in turn generated heat, which in turn generated pressure, activating the tank’s pressure-relief system and releasing MMA vapor into the atmosphere. Concerns about a runaway reaction, massive release, and explosion led the Orange County Fire Authority to order evacuation of approximately 40,000 residents and closure of thirteen schools.
Read the full story...Reprinted courtesy of
Sean M. Sherlock, Snell & WilmerMr. Sherlock may be contacted at
ssherlock@swlaw.com
RONI: What You Lose by Not Investing in AI – With Sam Zolfagharian
September 21, 2026 —
Aarni Heiskanen - AEC BusinessSam Zolfagharian returns to the AEC Business Podcast for her second appearance. She is an AI strategist, keynote speaker, and the author of two books, Disrupt It and Future by Design. She spoke at the AI in AEC conference in Helsinki in March, and we picked up the conversation where that keynote left off.
The starting point was a question her clients keep raising. Executives are being asked by their boards about the return on their AI investments, and many of them do not have an answer they trust. This episode is about what to measure instead, and when the dollar figure finally becomes the right number to look at.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Construction Liens and the “Substantial Performance” Doctrine
April 08, 2026 —
David Adelstein - Florida Construction Legal UpdatesIn a recent case dealing with a construction lien, the driving issue was whether the air conditioning contractor “substantially performed” before recording its construction lien against residential property. The importance here pertains to the substantial performance doctrine with respect to construction liens. The Third District Court of Appeal explained, with relevant citations, this doctrine as follows:
Under Florida law, a contractor is entitled to a mechanic’s lien if he complies with all provisions of Chapter 713, governing construction liens, and “has substantially performed the contract.” Grant v. Wester, 679 So. 2d 1301, 1307 (Fla. 1st DCA 1996) (quotation omitted); Langley v. Knowles, 958 So. 2d 1149, 1151 (Fla. 5th DCA 2007) (“The substantial performance doctrine recognizes that a contactor who complies with all of the provisions of the contactor’s lien statute is entitled to enforce a lien if he has substantially, but not completely, performed his contractual obligations.”). Substantial performance is performance “so nearly equivalent to what was bargained for that it would be unreasonable to deny the promisee the full contract price subject to the promisor’s right to recover whatever damages may have been occasioned him by the promisee’s failure to render full performance.” Ocean Ridge Dev. Corp. v. Quality Plastering, Inc., 247 So. 2d 72, 75 (Fla. 4th DCA 1971).
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Connecticut Expands Construction Wage-Theft Liability and Prevailing Wage Recordkeeping Requirements
June 29, 2026 —
Anand Gupta & Guest Contributor - Construction Law ZoneThis post was co-authored by Labor + Employment group lawyer Christopher Costain, Hayden Eckblom (Summer Intern), and Pasqualina Fox-Mina (Summer Associate). Hayden and Pasqualina are not admitted to practice law.
On May 11, 2026, Connecticut Governor Ned Lamont signed into law Public Act 26-12, a wide-ranging bill centered around employee rights. Our colleagues in Robinson+Cole’s Labor, Employment, Benefits + Immigration group recently published a
legal update summarizing the key components of Public Act 26-12. Here, we focus on the Wage Theft and Prevailing Wage concepts in the bill that directly relate to the construction industry.
Wage Theft
With exceptions for public works and small residential projects, general contractors will be jointly and severally liable for any unpaid wages owed to an employee of a subcontractor of any tier on private construction projects, beginning with contracts entered into on or after January 1, 2027. As we know, there is a separate regime for public works projects involving payment bonds.
Read the full story...Reprinted courtesy of
Anand Gupta, Robinson & Cole LLPMr. Gupta may be contacted at
agupta@rc.com
Owner Taking Assignment of General Contractor’s Claims Against a Subcontractor(s)
September 21, 2026 —
David Adelstein - Florida Construction Legal UpdatesHere’s a scenario that occurs in construction defect cases. An owner sues a general contractor and subs for construction defects. The owner settles with a number of parties and takes an assignment of the general contractor’s claims against some or all of the subs and pursues the remaining parties for indemnity based on the assignment of the general contractor’s claims.
This was the scenario in Craftsman Plastering and Lath, Inc. v. Rath Mor, LLC, 2026 WL 2328032 (Fla. 4th DCA 2026). The owner settled with the general contractor and all subs except one. The owner took an assignment of the general contractor’s claim against the sub, and really the indemnity claim. The owner was then substituted as the real party in interest as it relates to the general contractor’s claims against the sub. The owner sought roughly $780,000 in attorney’s fees and costs in connection with the dispute claiming the sub was liable for such fees. The jury didn’t buy the argument and awarded the owner about $55,000. Basically, the jury seemingly prorated the fees by the number of parties, at least, that’s how the math worked out. The owner didn’t like that and moved for an additur to increase the jury’s verdict which the trial court granted. This was reversed on appeal despite the fact that a trial court has broad discretion to grant a motion for additur.
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Louisiana Enacts Important Tort Reform Legislation
May 12, 2026 —
Lee M. Peacocke & Benjamin Perkins - Lewis BrisboisThe Louisiana legislature enacted tort reform legislation in 2025 to address the increasing cost of insurance in Louisiana and to provide some predictability to the Louisiana legal system. While our colleagues, Jenny Michel and Jennifer Kretschmann, have provided an excellent and comprehensive analysis of the legislation in their article entitled “Louisiana State Legislature 2025 Regular Session: Tort Reform - Acts & Vetoed Insurance Bill,” which can be found
here, this article examines the anticipated impact of the tort reform legislation on personal injury trials in federal and state courts in Louisiana.
The most significant reform involves the institution of a modified defense of contributory negligence, which went into effect on January 1, 2026. Since 1996, Louisiana had operated as a pure comparative fault state; the liability of each party whose fault caused damages was to be allocated among the respective parties based upon their appropriate percentage of fault, regardless of the legal theory of liability asserted against each party. Thus, a plaintiff 55 percent at fault could recover 45 percent of their damages from the liable defendants. The 2025 Tort Reform Amendments now prohibit a plaintiff in a personal injury action from recovering any damages if they are found to be 51 percent or more at fault for their damages. The 55 percent at-fault party in the example above is now prohibited from recovering any damages from any party. Importantly, this new legislation now requires the trial court to instruct the jury that if they find a plaintiff to be more than 50 percent at fault, then the plaintiff will not recover any damages.
Reprinted courtesy of
Lee M. Peacocke, Lewis Brisbois and
Benjamin Perkins, Lewis Brisbois
Mr. Peacocke may be contacted at Lee.Peacocke@lewisbrisbois.com
Mr. Perkins may be contacted at Benjamin.Perkins@lewisbrisbois.com
Read the full story...
PSA: Be Sure to Document (Even When Time is Short)
April 14, 2026 —
Christopher G. Hill - Construction Law MusingsWritten
change orders are a big deal. Almost all construction contracts (at least
the well drafted ones) require written contracts. Written change orders are even important enough that Virginia law
requires these provisions in residential construction contracts.
Why are they so important? Because they are a “mini-contract” of sorts. They
set the expectations, price, time, and work to be performed; work that was not included in the original price or scope for the project. Without this in writing, there will be no record of what the parties agreed to do. Does this sound familiar? Sound like its own contract? It should.
Read the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
What Is the Independent Tort Doctrine? New Case Explains…
August 24, 2026 —
David Adelstein - Florida Construction Legal UpdatesFlorida’s Sixth District Court of Appeals in Atout v. HHM Land Trust Dated October 29, 2013, 51 Fla.L.Weekly D1569a (Fla. 6th DCA 2026) recently included an extensive discussion on Florida’s independent tort doctrine. The independent tort doctrine is an important legal doctrine, particularly when parties are in contractual privity. This doctrine stands for the proposition that tort claims must be independent of any breach of contract. See Atout, supra. The Sixth District’s extensive discussion analyzed the indicators to determine this “independence,” which may arise from the source of the duty, the asserted conduct, the damages sought, or even public policy:
Unlike claims that rely on contractual relationships, an “independent” tort is often characterized by a duty imposed by law rather than by agreement. As to this consideration, United States District Court Judge Steven Merryday has explained that the independent tort doctrine honors the same divide as the economic loss rule, but rather than looking at the nature of the loss, it focuses on the source of the duty allegedly breached. “If a contract imposes a duty, and the defendant breaches that duty, the plaintiff must sue for breach of contract. If society imposes the duty, the plaintiff must sue in tort.” Following this reasoning, courts should consider whether the alleged breach of a duty in tort coincides or overlaps with a duty imposed by a contract. If the duty at issue is within the scope of a contract, and the relationship of the parties that led to the creation of that duty stems from a contract, then that duty’s source is from contract and any alleged tort claims based on a breach of those duties may not be “independent.”
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com