Conditional Payment Bond Consideration-Make Sure There Is Pay-If-Paid Provision
June 29, 2026 —
David Adelstein - Florida Construction Legal UpdatesIf a general contractor is going to have a conditional payment bond, it needs to ensure it subcontracts contain pay-if-paid or pay-when-paid provisions. This conditional payment language in subcontracts is the general contractor’s defense that it doesn’t have to pay a subcontractor UNTIL owner has paid the general contractor for the subcontractor’s work.
The general contractor (and the surety) can look at the conditional payment bond with the s. 713.245 legend stamped on its face designating the conditional nature of the bond, and assume the conditional structure is locked in against the bond: no payment from the owner, no obligation to the subcontractors under the bond. But what happens when the subcontracts contain no express conditional payment language despite having a valid conditional payment bond?
Read the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Denis Serkin and Michael S. Zicherman Co-Edit/Author Lexology Panoramic: Construction 2027
August 03, 2026 —
Denis Serkin & Michael S. Zicherman - Peckar & Abramson, P.C.P&A partners
Denis Serkin and
Michael S. Zicherman served as co-editors and authors of Lexology’s Panoramic: Construction 2027 – US and Global guide. Formerly Getting the Deal Through, Lexology Panoramic provides members of the construction industry and construction-related legal and business providers with side-by-side comparison of key industry issues in 19 jurisdictions worldwide.
Reprinted courtesy of
Denis Serkin, Peckar & Abramson, P.C. and
Michael S. Zicherman, Peckar & Abramson, P.C.
Mr. Serkin may be contacted at dserkin@pecklaw.com
Mr. Zicherman may be contacted at mzicherman@pecklaw.com
Read the full story...
Court Finds Potential Conflicts In Denying Insurer’s Motion to Dismiss Claim for Independent Counsel
October 12, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe District Court denied the insurer’s motion to dismiss the additional insured’s claim that the appointment of independent counsel was required. S. Cal. Edison Co. v. Travelers Prop. Cas. Co of Am., 2025 U.S. DIst. LEXIS 148495 (C.D Calif. July 15, 2025).
Southern California Edison Company (SCE) entered a Master Services Agreement with its contractor, SASCO whereby SASCO agreed to provide services concerning electrical pole repair and replacement. SASCO was required to obtain primary and excess general liability policies and to name SCE as an additional insured. SASCO obtained such policies from Travelers, naming SCE as an additional insured. The policies limited coverage for SCE to covered damages arising from SASCO’s work.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Preventing Common and Costly Water Intrusion Events in Construction
July 13, 2026 —
Andrew Swift - Construction ExecutiveWater leaking into a building is a leading cause of
damage and loss in the construction industry. On one jobsite, heavy rains flooded a sub-basement, damaging a new electrical transformer—all because a roof drain was not property connected. On another jobsite, a drinking-fountain supply line broke in a multistory building that was undergoing renovation, causing water to run—undetected—for an entire weekend, resulting in water damage to all lower floors, where construction had been finished.
Those loss scenarios could have been prevented with a comprehensive and effective water damage prevention plan (WDPP). This includes routine site inspections to identify uncontrolled water damage exposures and basic maintenance to make sure drains are clean of debris and divert them to a catch basin or low point away from the building. An effective WDPP plan also incorporates technology such as backflow preventers on sewer connections and water sensing technology to monitor the most vulnerable exposures.
Reprinted courtesy of
Andrew Swift, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...
Insured General Contractor Prevails on Motion for Summary Judgment to Establish Builder’s Risk Coverage
July 06, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe general contractor’s motion for partial summary judgment successfully established that damage to footings in place before the policy period was covered after the collapse of a building. Big D Builders, Inc. v. Am Zurich Ins. Co., 2026 U.S. Dist. LEXIS 72012 (D. Idaho March 31, 2026).
Big D was the general contractor for building a new airplane hangar by erecting a 38,000 square foot structure. Before Big D began construction, the site of the hangar did not contain any pre-existing structures or buildings. Before completion of the hangar, it collapsed and caused extensive property damage.
The builder’s risk policy issued by Zurich covered certain aspects of the construction project for the policy period December 28, 2023, to December 28, 2024. Zurich accepted coverage for most of the damage but not for damage to footings and columns installed prior to the start date of the policy.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
From Dark Data to Building Intelligence
July 13, 2026 —
Aarni Heiskanen - AEC BusinessIn this episode, I talk with Mark Sorsa-Leslie, founder and CEO of
Auttaa AI, whose team just won first place in Luotea’s inaugural hackathon in Helsinki for turning property maintenance from reactive firefighting into proactive forecasting with AI. Mark is a chartered surveyor with 30 years of real estate data experience, previously the founder of the UK sensor company Beringar.
We discuss why so much building data stays dark and siloed, from outdated networking technology to the shortage of people who understand both engineering and property. Mark explains how Auttaa bridges real-time building data with large language models, using what he calls an “influence graph” to surface correlations and causation across previously disconnected systems, such as linking occupancy patterns to CO2 readings to diagnose ventilation problems in minutes rather than days.
Read the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Limitations of Liability Provisions in Construction Contracts: A Means to Manage Risk and Limit Financial Exposure
June 23, 2026 —
Ellen Chapelle, Richard Reizen, Hannah Batsche - Construction ExecutiveTaking a cue from architects and engineers, construction contractors have started inserting limitation of
liability clauses in their construction contracts to manage risk and limit financial exposure. This article will address the specific risks that can be limited through an LOL, tips for negotiating the LOL terms with reluctant owners to cover those specific risks, how to limit unintended consequences of an LOL (such as relieving an insurer of its obligations to cover certain losses), and approaches to setting the amount of the liability cap in the LOL.
Addressing Particular Risks
An LOL can address a wide range of risks, including:
- Damages for delay
- Liability for non-conforming or defective work
- Liability for third-party bodily injury or property damage
- Liability excluded by a general liability policy (e.g., pollution and cyber liability)
- Liability related to intellectual property
Reprinted courtesy of
Ellen Chapelle, Richard Reizen, Hannah Batsche, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the full story...
Suit Limitation Provision Eliminates Wind Loss Claim
July 27, 2026 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer’s motion for judgment on the pleadings was granted after the insured failed to file suit against the insurer within the policy’s two-year suit limitation provision. Interstate Investments, LLC v. Mt. Hawley Ins Co., 2026 U.S. Dist. LEXIS 98108 (S.D. N. Y. May 4, 2026).
On or before June 27, 2023, a wind, hail and rainstorm damaged Interstate’s property in Oklahoma. Interstate filed a claim under its policy with Mt. Hawley. The policy provided that New York law applied and contained a two- year suit limitation provision.
Read the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com