Construction Change Order EXPERT WITNESS DIRECTORY
John Sorcinelli ada copliance expert witness, Nevada Construction Expert Witness Directory, New Hampshire Construction Expert Witness Directory, New Jersey Construction Expert Witness Directory, New Mexico Construction Expert Witness Directory, New York Construction Expert Witness Directory, North Carolina Construction Expert Witness Directory, North Dakota Construction Expert Witness Directory, Ohio Construction Expert Witness Directory, Oklahoma Construction Expert Witness Directory, Oregon Construction Expert Witness Directory JOHN SORCINELLI
CONSULTING ARCHITECT

Licensed Architect, State of California

Registered Architect, British Columbia, Canada

Registered Architect, United Kingdom

Registered Architect with NCARB

Member of the American Institute of Architects

Member of the Royal Institute of British Architects

Vice Chairman Royal Institute of British Architects, Los Angeles Chapter

Member of the Architectural Institute of British Columbia

Founder and President of the San Dimas Marketplace, Inc. (non-profit)

Contact John Sorcinelli

Gary Ray ICC Certified Building Inspector, Licensed engineering contractor,Pennsylvania Construction Expert Witness Directory, Puerto Rico Construction Expert Witness Directory, Rhode Island Construction Expert Witness Directory, South Carolina Construction Expert Witness Directory, South Dakota Construction Expert Witness Directory, Tennessee Construction Expert Witness Directory, Texas Construction Expert Witness Directory , Utah Construction Expert Witness Directory Gary Ray - ICC CERTIFIED
BUILDING INSPECTOR

GENERAL BUILDING &
ENGINEERING CONTRACTOR

LICENSED ELECTRICAL
CONTRACTOR

Master of Business Administration, Major: Construction Management, Alameda University

Licensed General Contractor — B, State of California

Licensed General Contractor — Engineering A, State of California

Licensed Electrical Contractor

International Code Council, Contributing Council Member

International Code Council, Certified International Residential Inspector

American Society of Safety Engineers, Certified Member, Safety Trained Supervisor

4-Year Apprenticeship Program, Journeyman Carpenter (Union 2203)

4-Year Apprenticeship Program, Journeyman Electrician

Contact


Kevin Heidelberger roofing consultant, Construction Change Order, Vermont Construction Expert Witness Directory , Virginia Construction Expert Witness Directory, Virgin Islands Construction Expert Witness Directory, Washington Construction Expert Witness Directory, West Virginia Construction Expert Witness Directory, Wisconsin Construction Expert Witness Directory,Wyoming Construction Expert Witness Directory KEVIN HEIDELBERGER
ROOFING & WATERPROOFING CONSULTANT

Licensed Roofing Contractor, C39-539648, State of California

Licensed Roofing Contractor (C15A), State of Nevada

Certified Waterproofing Applicator

Instructor — Tile Roof Institute

Member, Tile Roof Institute

Member, Western States Roofing Contractors Association (WSRCA)

Certified Installer — Tile Roof Institute

Certified Specifier Tile Roof Institute

Carlisle Waterproofing — Certified Inspector

Contact

Bradley W. Hughes, Construction Change Order BRADLEY W. HUGHES
ROOFING CONSULTANT

Licensed General Building Contractor, B-00723912, State of California

Licensed Roofing Contractor, C39-00723912, State of California

Graduate, Control Data Institute, Anaheim, CA

Associate of Science Equivalence Diploma computer technology

Member, Construction Specifications Institute

Tile Roofing Institute Certification

Contact


Alan D. Sturm ALAN D. STURM
CONSULTING GENERAL
BUILDING CONTRACTOR

Experienced in residential, commercial and catastrophic property claims with certifications from National Flood Insurance Program
 (NFIP), California Earthquake Authority (CEA), State Farm, Allstate, Tower Hill, Liberty Mutual, St. Paul/Travelers  Licensed Insurance Adjuster in Five States

Contact


Paul Viau PAUL S. VIAU - CONSULTING GENERAL
BUILDING CONTRACTOR

ICC CERTIFIED BUILDING
INSPECTOR

Licensed General Building Contractor — B, State of California

Licensed General Contractor — KB-02, State of Arizona
ICC Certified Building Inspector

IICRC Certified Water Restoration Technician
Applied Microbial Remediation Technician

Bachelor of Science in Business Administration, California Polytechnic State University, San Luis Obispo

Member, International Code Council

Contact


Brian Vann, Construction Change Order BRIAN VANN - CONSTRUCTION CLAIMS
SPECIALIST

Licensed Contractor, New Mexico

Bachelor of Arts Degree, Architecture, University of California, Berkeley

IICRC-Certified Water Restoration Technician

Applied Microbial Remediation Technician

Instructor, Santa Fe Community College, Santa Fe, New Mexico

Instructor, University of Colorado Center
Certified Estimator, Xactimate

Contact

David Suggs DAVID L. SUGGS
LICENSED GENERAL BUILDING CONTRACTOR

CONSTRUCTION COST
EXPERT

Licensed General Building Contractor, B-778968, State of California

Certified Waterproofing Applicator

Member, American Society of Professional Estimators

Member, Construction Specifications Institute

Contact

Jack J. Taylor JACK J. TAYLOR
COST ESTIMATING
SPECIALIST

Licensed General Contractor, State of California

Licensed Concrete Contractor, State of California

Certificate of Graduation in Construction Cost Estimating CMI

Carpenter’s Apprenticeship Program - San Bernardino Valley College

Member American Society of Professional Estimators

Certified Waterproofing Applicator

Certificate-IICRC & AGGIH Mold Remediation in Buildings

Contact

Gregory C. Cook GREGORY C. COOK
CERTIFIED MOLD REMEDIATION CONTRACTOR

Licensed General Contractor, California

ICBO Residential Building Inspector

Certified Mold Remediation Contractor

Contact

Anthony R. Montosa ANTHONY R. MONTOSA
CONSULTING PLUMBING &
GENERAL BUILDING
CONTRACTOR

Licensed General Building Contractor, State of California

Licensed Plumbing Contractor, State of California (C-36)

Graduate, Foothill College

Member, Plumber’s Union Local 393

Contact


Jorge Porter GEORGE PORTER
CONSULTING ARCHITECT

MASTER BUILDING INSPECTOR

ADA COMPLIANCE EXPERT

Licensed Architect, California

Licensed Architect, Mexico

Bachelor in Architecture, Escuela Mexicana de Arquitectura, La Salle University, Mexico City, Mexico

Contact Jorge Porter


Construction Change Order Expert Witness Directory

Construction Change Order Construction Expert Witness Directory


Find Credentialed Construction Change Order Construction and Design Professionals with expert witness experience gained through more than 4000 construction defect and claims related litigations.  The Construction Expert Witness and Consulting Group provides expert opinion, analysis and construction related consulting services to the nations most recognized law firms, Fortune 500 Builders, commercial general liability carriers, building product manufacturers, owners, property management firms, public companies, as well as a variety of state and local government agencies. Contact us today to arrange for an initial consultation regarding your matter.
ADA Compliance Expert Witness Brian G. Moffitt
consulting architect

Licensed Architect, Nevada
Licensed Architect, Arizona
Licensed Architect, Texas
Master of Architecture, University of Utah
Bachelor of Science, University of Utah
Member, American Institute of Architects
Member, Construction Specifications Institute


Contact
Construction Expert Witness Windows, Fenestrations Expert Witness Windows Certification Expert Witness Window Leak Testing Expert Witness Building Envelope Expert Witness Concrete – Sulphates Expert Witness Builders Right To Repair Expert Witness Entitlement Planning Expert Witness Construction Change Order Analysis Expert WitnessNevada Chapter 40 Expert Witness California SB 800 Compliance Expert Witness John D. Tolman
construction consultant

Licensed General Building Contractor, B-410125, State of California
Licensed Real Estate Broker — California
Doctorate of Law — Western State University
Bachelor of Science, Law — Western State University
Bachelor of Arts — University of Redlands
Member — American Bar Association
Member — Building Industry Association
Member — American Society of Professional Estimators
Member — Construction Specification Institute
Member — Association of General Contractors


Contact
 Construction Change Order expert witness, Consulting Civil Engineer Construction Safety OSHA Expert Witness Construction Site Accidents Expert Witness Disabled Access Expert Witness Doors – Finish Carpentry Expert Witness Electrical Engineering Expert Witness Electrical Contracting – Standard of Care Expert Witness Fire Sprinklers Expert Witness Fire Loss Evaluation Expert Witness Flood Loss Recovery Estimating Expert Witness Geotechnical Engineering Expert Witness Glazing Expert Witness Hydrology & Groundwater Expert Witness Mark E. Rieser II - ms,pe
consulting civil engineer
engineering contractor
general building contractor

Masters Degree in Civil Engineering, San Jose State University
Bachelor of Science Degree in Civil Engineering, San Jose State University
Registered Civil Engineer, State of California
Licensed General Engineering Contractor, A-00815841, State of California
Licensed General Building Contractor, B-00815841, State of California
Member, American Society of Civil Engineers
Member, Association of General Contractors

Contact
 



Construction Change Order Expert Witness Directory - Continued


Find Credentialed word Construction Experts in the fields of Architecture, Civil and Structural Engineering.  General Engineering, Building and Specialty Contractors with the collective experience gained through more than 4000 construction defect and claims related litigations.

To find construction, engineering and forensic architecture expert witnesses, please click  the following listed areas of expertise in the left navigation bar.
expert witness Construction Change Order, Forensic Architect Metallurgy Expert Witness Mobile Homes Expert Witness Plumbing & HVAC Expert Witness Pools & Spas Expert Witness Roofing – Built Up Roofing Expert Witness Roofing – Industrial Expert Witness Roofing – Membrane System Expert Witness Roofing – Tile, Composition Expert Witness Safety Engineering Expert Witness Water Utility Expert Witness John Springman
forensic architect

Master of Architecture, University of Illinois
Licensed Architect, California
Licensed Architect, Colorado
Licensed Architect, Nevada
Licensed Architect, Texas
NCARB Certification
California Supplemental Examination Commissioner, California State Board of Architects

Email: jspringman@construction-expert-witness.com
Contact

Industrial Design Expert Witness Construction Delay Claims Analysis Expert Witness Construction Acceleration Claims Expert Witness Construction Contracts Expert Witness Industrial Hygiene Expert Witness Mold Damage Analysis Expert Witness Mold Remediation Contractor Expert Witness Landscape Design Expert Witness Lath & Plaster Expert Witness EIFS – Exterior Insulated Finish Systems Expert Witness Mapping & Surveying Expert Witness Mechanical Engineering Expert Witness Metal Roofing Expert Witness Mark Chapman
consulting civil engineer
general building contractor

Bachelor of Science, Civil Engineering, 1991, California State University, Long Beach
Registered Civil Engineer for California, 52142, 1994
Registered Civil Engineer for Arizona, 36022
Registered Civil Engineer for Nevada, 014532
Licensed General Building Contractor, B-632445, State of California


Contact


Consulting Architect Expert Witness ADA Compliance Expert Witness Construction Change Order Expert Witness Architectural Forensics Expert WitnessMasonry, Brick, Stone Expert Witness CMU Walls Expert Witness Retaining Walls Flooring – Tile, Travertine, Tile, Stamped Concrete Expert Witness Civil Engineering Expert Witness Concrete –Poured in Place Expert Witness Concrete – Structural Expert Witness Concrete – Slabs, Foundations, Structural Expert Witness Concrete – Post Tensioned Slabs Expert Witness Construction Standards of Care Expert Witness Construction General Contracting Expert Witness Construction Engineering Expert Witness Construction Cost Estimating Expert Witness Construction Management Expert Witness Construction Monitoring Expert Witness Stan Bezue architect
building envelope expert
consulting general contractor

Bachelor of Architecture, Southern University, Baton Rouge, Louisiana
Licensed Architect, California
Licensed General Building Contractor, B-00846803, State of California
Member, American Institute of Architects


Contact
Matt Nardella Matthew J. Nardella, architect
ada compliance consultant

Licensed Architect, State of California
Registered Residential Designer, State of Nevada
Bachelor of Architecture, California State Polytechnic University, Pomona
California Supplemental Oral Examination Commissioner, California State Board of Architectural Examiners
Organizational Member, American Concrete Institute


Contact
John Mancini architect, Alabama Construction Expert Witness Directory, Alaska Construction Expert Witness Directory, Arizona Construction Expert Witness Directory, Arkansas Construction Expert Witness Directory, California Construction Expert Witness Directory, Colorado Construction Expert Witness Directory, Connecticut Construction Expert Witness Directory, Delaware Construction Expert Witness Directory, Florida Construction Expert Witness Directory, Georgia Construction Expert Witness Directory, Hawaii Construction Expert Witness Directory, Idaho Construction Expert Witness Directory, Illinois Construction Expert Witness Directory John B. A. Mancini - architect
general building contractor
ada design-compliance expert

Licensed Architect, California
Licensed General Contractor — B, State of California
California Supplemental Examination Commissioner, California State Board of Architects
Certificate, High Density Urban Planning, Urban Land Institute
Guest Speaker, American Society of Consulting Engineers (Forensic Evidence Collection)


Contact
Doug Gorrie forensic architect, Iowa Construction Expert Witness Directory, Kansas Construction Expert Witness Directory, Kentucky Construction Expert Witness Directory, Louisiana Construction Expert Witness Directory, Maine Construction Expert Witness Directory, Maryland Construction Expert Witness Directory, Massachusetts Construction Expert Witness Directory, Michigan Construction Expert Witness Directory, Minnesota Construction Expert Witness Directory, Mississippi Construction Expert Witness Directory, Missouri Construction Expert Witness Directory, Montana Construction Expert Witness Directory, Nebraska Construction Expert Witness Directory Douglas F. Gorrie
consulting architect

Licensed Architect, California
Licensed Architect, Nevada
Licensed Architect, Arizona
Licensed Architect, Texas
NCARB Certified
Organizational Member, American Concrete Institute
Bachelor of Architecture, University of Oregon


Contact

Construction Change Order Construction Expert Witness Directory -  Engineering, and Forensic Architecture Expert Witnesses By State

Alabama  Alaska  Arizona  Arkansas  California  Colorado  Connecticut  Georgia Florida  Georgia  Hawaii  Idaho  Illinois  Iowa  Kansas  Kentucky  Louisiana  Maine Maryland  Massachusetts  Michigan  Minnesota  Mississippi  Missouri  Montana Nebraska  Nevada  New Hampshire  New Jersey  New Mexico  New York  North Carolina  North Dakota   Ohio  Oklahoma  Oregon  Pennsylvania  Puerto Rico  Rhode Island  South Carolina  South Dakota  Tennessee  Texas  Utah  Vermont  Virginia Virgin Islands  Washington  West Virginia  Wisconsin  Wyoming

Construction Change Order Expert Witness - Project Experience Summaries

Construction Change Order Litigation Case Bio's and Summaries. For an initial consultation or discussion regarding a new matter please arrange a confidential consultation



 
U.C. Riverside Science Library
A project involving the catastrophic failure of large-diameter underground air-conditioning chiller lines and the resulting settlement of fill materials, attendant water damage to adjacent structures, and loss of use. CONSTRUCTION EXPERT WITNESS CONSULTANTS developed repair and damage evaluations which were instrumental in the successful prosecution of subsequent subrogation action.


 
Lish Residence
Located in Twinsburg, Ohio, the claim involves EIFS exterior cladding, alleged window issues, and other building code deficiencies. Bert L. Howe & Associates, Inc. performed an evaluation of the plans, construction documents, and installation. Our consulting, design and construction professionals provided project monitoring, observed and documented removal and replacement of system.


 
UCLA Northwest Housing Complex
A construction expert witness designation on a project involving the recently completed Northwest Housing Complex on the UCLA campus. The complex consists of 3 multi-story residential units and a large, five-story multipurpose facility encompassing classrooms, auditoriums, a food facility, and campus support services. Repairs and damages amounting to $18,000,000 were addressed and included alleged deficiencies in structural and fire-resistive systems and failures in exterior waterproofing systems and materials resulting in water intrusion and mold growth.


 
Las Vegas Club, Las Vegas Nevada
A $5,000,000 remediation construction expert witness designation included analysis of EIFS cladding and related exterior fenestration at the hotel tower portion of the casino. Specialized protocols were developed in order to accomplish exterior repairs without disruption of normal hotel and casino operations and to minimize street-level impact on guests. Special fenestration components and related interface details were developed in order to integrate repairs at the South Wall Facade while maintaining a continuous one-hour minimum fire-rating at this area.


 
San Bernardino County Medical Center
A $251,000,000 regional medical center constructed in San Bernardino County, California. Claims included alleged failure of terrazzo flooring materials and water damages and mold contamination related to shower membrane leaks in patient rooms. Construction expert witness designation included analysis of repair protocols developed by our consulting construction and design professionals were implemented resulting in substantial savings to insurers and continual, uninterrupted hospital operations during mold abatement remediation and repair.


 
Dickens Senior Housing Project, Sherman Oaks California
A project involving water intrusion at a senior citizen condominium facility. The complex consists of a two-story wood-framed structure over a combination above- and below-grade, cast-in-place concrete parking structure. Construction defect claims included water intrusion through roofing assemblies, stucco wall and window systems, and membrane waterproofing materials at public courtyards and walkways over the parking structure. Special repair protocols were developed with regard to sound and dust mitigation and a sophisticated relocation schedule was prepared in order to minimize resident discomfort and displacement.


 
Four Seasons Housing, Inc.
Located in Cincinnati, Ohio, the claim involves alleged structural and installation issues resulting in substantial interior and exterior damage. CONSTRUCTION EXPERT WITNESS CONSULTANTS provided evaluation of plans, engineering, site conditions, and manufactures installation requirements.


 
Banning’s Landing Community Center, Wilmington, Port of Los Angeles
A $5,000,000 state-of-the-art multipurpose cultural and meeting facility located in the port community of Wilmington, California. Construction defect claims arose from damages caused by prolonged weather exposure resulting from numerous construction delays. Due to complex design elements and the interpolation of multiple architectural, structural, and material finish elements, the development of repair protocols presented us with unique challenges. Adding to the complexity of the project was the complete remediation of the center prior to our involvement, which forced a heavy reliance on construction documents and project logs.


 
Mission Ridge Apartments, Las Vegas Nevada
A $9,000,000 project involving a 256-unit, 16-building apartment complex in Las Vegas, Nevada. Repair and damage evaluations were developed relative to significant deterioration of exterior stucco wall systems, correlating to multiple contributing sources. Our construction consulting and design experts provided in-depth analysis of leak history documents, historical photographs of previously repaired damage, and deficiency listings and repair recommendations developed during mediation. As a result of this analysis, our team was able to successfully allocate responsibility to multiple sources outside the insured’s scope of work, resulting in a savings to the carrier in excess of 96% off the mediation demand.


 
Union Bank Plaza, Los Angeles
A $1,000,000 renovation and tenant improvement project encompassing the street level plaza and mezzanine promenade fronting the Union Bank building in downtown Los Angeles. Responding to alleged construction defects included repair and damage evaluations that were developed relating to failed substrate topping slab materials, horizontal and vertical waterproof membrane systems over a subterranean garage, and the failed application of granite pavers and building wainscot cladding.


 
Senior Systems Technology, Palmdale California
A construction defect and claims project involving the failure of the slab-on-grade in a $7,000,000 high-tech computer manufacturing facility and the resulting damage to sophisticated static electricity-dissipating flooring systems.


 
Southern Ohio Health Services Facility
In this project, located in Seaman, Ohio, we undertook site investigation and testing in order to determine issues pertinent to Construction Change Order.


 
Pasadena Industrial Building
This project had issues including foundation deformation and subsidence. The foundation was augmented and leveled by the use of helical anchors. The building was reinforced. Slab replacement was required.


 
Cleveland Fourplex
Multi-family development located in Cleveland, Ohio, our team of consulting general building contractors completed Construction Change Order analysis on single and multi-family projects throughout northeastern Ohio.


 
Amburn Residence
35,000 sf home, located in Mount Pleasant, SC. Alleged defects include failure of the EIFS exterior cladding causing water intrusion and substantial damage to framing materials. Complete analysis of exterior cladding, roofing, and fenestration were completed in support of the general liability carriers legal team.


 
Carrell Residence
Project located in Simpsonville, South Carolina, involving water intrusion and mold claims. Investigations by our consulting general building and mold remediation contractors have identified elements of the roofing, siding, and balcony waterproofing had contributed to the water intrusion and associated mold issues.


 
Centex Homes
Seventeen homes in this project, located at the Charleston National Country Club, have front elevations that were clad with EIFS. Damage and repair evaluations were developed to rectify the issues at minimal cost without displacing the residents.


 
Clifford Pierce Middle School
Located in Merrillville, Indiana, a scaffolding accident left a worker with permanent injuries. Evaluation of OSHA regulations, weather, and job site conditions was performed by design and construction safety experts to assist in the settlement and allocation of responsibility.


 
Duncan Residence
45,000 sf plantation home near Myrtle Beach, South Carolina, involving allegedly defective EIFS siding. Our design and construction consultants provided an evaluation of defects and repair costs, and assisted in the building product manufacturers legal team in reaching a settlement of a $750,000 construction defect claim for less than $80,000.


 
Eckstein Residence
A $1.7 million home in Paducah, Kentucky. Allegations of water intrusion and mold. Investigation by our consulting general building contractors of windows and deck waterproofing assisted in reaching a settlement with plaintiffs at a significant reduction from the original litigation demand.


 
Hadwin-White GMC
Near Myrtle Beach, South Carolina. Remodeling of the building consisted of EIFS installation and roof alteration, allegedly causing water intrusion and subsequent damage. Our construction and design professionals provided investigation of design and installation to determine potential design deficiencies and damage repair costs.


 
King Residence
Located in Columbia, South Carolina, alleged defects include water intrusion at the front picture window. Investigation by our consulting team addressed alleged deficiencies relating to stone veneer and window construction.


 
Logan-Todd Regional Water District
$3.7 million project of a raw water intake plant on the Cumberland River in Hartsville, Kentucky. Issues include contracts, delay claims, and liquidated damages. Construction Change Order investigations were undertaken as well as evaluation of site conditions, and conditions relating to contract firms was completed resulting in substantial savings to our client.


 
Sither Residence
Located in Paducah, Kentucky, defect claims involve drainage and structural issues, causing severe damage to rear elevation of the structure. Expert witness services and analysis included evaluation of plans, engineering, and site conditions.


 
Smith Residence
Located in Hilton Head Island, South Carolina, the claim involves allegedly defective EIFS exterior cladding, allegedly defective fenestration, and other building code deficiencies. Our construction and design professionals provided reports, and assisted legal professionals in reaching a negotiated settlement at substantial savings to the client.


 
Oak Park Calabasas
Construction defect litigation involving a  360 unit condominium development located in the City of Calabasas, California.


 
Dreamworks
Construction defect litigation at the Dreamworks Animation Studio and campus, a motion picture and television production facility located in Glendale, California.


 
One Harbor
Construction defect litigation and construction claims case. Twin, high rise condominium towers overlooking San Diego Bay, Coronado Island, and downtown San Diego.


 
Fullerton Police Department
Construction defect and claims litigation involving the expansion and renovation of the Fullerton Police Department headquarters, an administrative and jail facility a public works project serving the City of Fullerton, California.


 
Cal State Fullerton
A construction defect litigation at a public university science laboratory facility on the campus of California State University, Fullerton.


 
701 Ocean
Construction defect and claims litigation relevant to a four-story condominium structure with a below-grade parking facilities and a rooftop pool/sun deck, overlooking the Pacific Ocean on Ocean Avenue in Santa Monica, California.


 
Hennessey’s Tavern
A construction claims project at a popular restaurant and tavern located on the Strand in Redondo Beach, California.


 
Palmdale Marketplace
Large retail project and regional shopping center anchored by multiple major tenants and located in Palmdale, California. Expert designation in construction defect litigation involved destructive testing, cost analysis, repair monitoring and project management. Our team of consulting general building contractors provided support to legal professionals resulting in substantial recovery in negotiated settlement with builder and sub trades.


 
Schaff v. Boulder Development
In this construction defect case consisting of more than one hundred individual houses in Mentone, it was alleged that improper site preparations left large cobbles and under-compacted soils materials that caused excessive water to pass beneath dwellings. Water vapor transmission through slabs causing damage to interiors and deterioration of concrete slabs through sulfate attack. Contemplated repair scenarios included evaluation of costs relating to soils injection with 3M product to provide underside slab waterproofing, construction of foundation cut-off trenches filled with concrete, and underpinning foundations.


 
Prince Turki Residence
A 45,000 sf private residence located in Bel Air, California. Construction defect litigation.


 
Plaza Temecula
A multi-tenant regional shopping center and retail complex and light commercial complex located in Temecula, California.


 
Yorba Linda Community Center
A state-of-the-art, multipurpose community and senior center facility located in Yorba Linda, California.


 
University of California Riverside v. Barnhard - Construction defect litigation at a public university. Allegations and construction expert witness designation involved a high pressure line break causing flood and erosion to UCR’s new science building. Repairs required extensive excavation, re-compaction, and repair to site and building.

 


 
Construction Change Order Expert Witness Directory
Click the links below to find qualified Construction Change Order construction and design experts as well as credentialed experts in the following categories...
Forensic Architects   General Contracting Experts   Building Envelope Experts   Civil Engineering Experts   Electrical  Expert Witness
consulting engineers, general contracting expert witness, forensic architects, building envelope experts, construction defect and claims experts
 
 Expert Witness Directory Construction Change Order